background image

Installation manual

11

RZQG71~140L + RZQSG100~Y1B(9)

Split system air conditioners

4P327537-1 – 2012.08

Cautions on handling the stem cap

The stem cap is sealed where 
indicated by the arrow. Take care not 
to damage it.

After handling the stop valve, make 
sure to tighten the stem cap securely. 
For the tightening torque, refer to the 
table below.

Check for refrigerant leaks after tightening the stem cap.

Cautions on handling the service port

Always use a charge hose equipped with a valve depressor pin, 
since the service port is a Schrader type valve.

After handling the service port, make sure to tighten the service 
port cap securely. For the tightening torque, refer to the table 
below.

Check for refrigerant leaks after tightening the service port cap.

9.4.

Tightening torques

10. Refrigerant piping

Field pipes can be installed in four directions (A, B, C, D).

Figure - 

Field pipes in 4 directions

1

Drill

2

Centre area around knock-out hole

3

Knock-out hole

4

Slit

5

Connecting pipe

6

Bottom frame

7

Front plate

8

Pipe outlet plate

9

Screw front plate

10

Pipe outlet plate screw

A

Forward

B

Backward

C

Sideways

D

Downward

Cutting out the two slits makes it possible to install as shown in 
the 

figure "Field pipes in 4 directions"

.

(Use a metal saw to cut out the slits.)

To install the connecting pipe to the unit in a downward direction, 
make a knock-out hole by penetrating the centre area around 
the knock-out hole using a Ø6 mm drill (4x). (See 

figure "Field 

pipes in 4 directions"

.)

After knocking out the knock-out hole, it is recommended to 
apply repair paint to the edge and the surrounding end surfaces 
to prevent rusting.

When passing electrical wiring through the knock-out holes, 
remove any burrs from the knock-out holes and wrap the wiring 
with protective tape to prevent damage.

1

Knock-out hole

2

Burr

3

Packing materials

10.1. Preventing foreign objects from entering

Plug the pipe through-holes with putty or insulating material 
(procured locally) to stop up all gaps, as shown in the figure.

1

Putty or insulating material 
(produced locally)

If there is any possibility that small animals 
enter the system through the knock-out holes, 
plug the holes with packing materials (field 
supplied).

Insects or small animals entering the outdoor unit may cause a short 
circuit in the electrical box.

Seal knock-out holes to avoid snow and humidity entering.

10.2. Precautions when connecting field piping and 

regarding insulation

Be careful not to let the indoor and outdoor piping come into 
contact with the compressor terminal cover.
If the liquid-side piping insulation might come into contact with it, 
adjust the height as shown in the figure below. Also, make sure 
the field piping does not touch the bolts or outer panels of the 
compressor.

When the outdoor unit is installed above the indoor unit the 
following can occur:
The condensed water on the stop valve can move to the indoor 
unit. To avoid this, please cover the stop valve with sealing 
material.

If the temperature is higher than 30°C and the humidity is higher 
than RH 80%, then the thickness of the sealing materials should 
be at least 20 mm in order to avoid condensation on the surface 
of the sealing.

Item

Tightening torque (N•m)

Stem cap, liquid side

13.5~16.5

Stem cap, gas side

22.5~27.5

Service port cap

11.5~13.9

1

2 3

4

4

5

6

7

8

B

C

9

10

A

D

1

2

3

1

Содержание SkyAir RZQG100L7V1B

Страница 1: ...RZQG71L7V1B RZQG100L7V1B RZQG125L7V1B RZQG140L7V1B RZQG71L7Y1B9 RZQG100L7Y1B RZQG125L7Y1B RZQG140L7Y1B RZQSG100L7V1B RZQSG125L7V1B RZQSG140L7V1B RZQSG100L7Y1B9 RZQSG125L7Y1B9 RZQSG140L7Y1B Split syst...

Страница 2: ...A B 1 2 4 5 H1 L3 L2 L3 L4 L2 L3 L3 L4 L5 L6 A C E B D H 1 2 3 1 50 Hz 220 240 V 3N 50 Hz 380 415 V V1 type Y1 type 1 2 4 5 A 1 A 2 100 100 100 100 1 1 2 H1 H1 H1 H2 H2 H2 L1 L1 L1 L1 L2 7 R410A R410...

Страница 3: ...com o Certificado C 09 A B C 10 Bem rk som anf rt i A og positivt vurderet af B i henhold til Certifikat C 11 Information enligt A och godk nts av B enligt Certifikatet C 12 Merk som det fremkommer i...

Страница 4: ...run 18 15 4 Precautions regarding test runs 19 15 5 Failure diagnosis at the moment of first installation 19 16 Wiring diagram 20 Thank you for purchasing this product The original instructions are w...

Страница 5: ...at can withstand its weight Insufficient strength may result in the fall of equipment and causing injury Carry out the specified installation work in consideration of strong winds typhoons or earthqua...

Страница 6: ...it is advised to foresee a delay of 10 minutes for signalling the alarm in case the alarm temperature is exceeded The unit may stop for several minutes during normal operation for defrosting the unit...

Страница 7: ...bother next door neighbours Safe places which can withstand the unit s weight and vibration and where the unit can be installed level Places where there is no possibility of flammable gas or product...

Страница 8: ...e outdoor unit In heavy snowfall areas it is very important to select an installation site where the snow will not affect the unit and set the outlet side at a right angle to the direction of the wind...

Страница 9: ...outlet space position the units with consideration to the space required for the onsite refrigerant piping work as well Consult your dealer if the work conditions do not match those in the drawings 7...

Страница 10: ...llation shall comply with applicable legislation In Europe the EN378 is the application standard that shall be used NOTICE To persons in charge of piping work Be sure to open the stop valve after pipi...

Страница 11: ...ze Model 71 100 125 140 Maximum total one way piping length a a Parenthesized figure represents the equivalent length Pair L1 size down 10 m 10 m standard 50 m 70 m 75 m 90 m size up 25 m 35 m 35 m 45...

Страница 12: ...ecause using existing piping with deteriorated oil will cause compressor breakdown Put some residual oil of the pipes you want to reuse on a piece of white paper or on the white surface of an oil chec...

Страница 13: ...ine it will deteriorate the refrigerant oil 9 3 Stop valve operation Cautions on handling the stop valve Make sure to keep both stop valves open during operation The figure below shows the name of eac...

Страница 14: ...to the edge and the surrounding end surfaces to prevent rusting When passing electrical wiring through the knock out holes remove any burrs from the knock out holes and wrap the wiring with protective...

Страница 15: ...leaks Use a 2 stage vacuum pump with a non return valve which can evacuate to a gauge pressure of 100 7 kPa 5 Torr absolute 755 mm Hg Connect the vacuum pump to both the service port of the gas stop...

Страница 16: ...the leak test and vacuum drying see 11 Leak test and vacuum drying on page 12 This unit requires additional charging of refrigerant according to the length of refrigerant piping connected at the site...

Страница 17: ...kg b G2 12 m 6 4 R2 0 6 kg 3 Refrigerant charge amount R R1 R2 0 5 0 6 1 1 kg Example 2 1 G1 L1 5 m G2 L2 L3 L4 17 17 20 54 2 Over 30 m a G1 5 m R1 0 0kg b G1 G2 30 5 54 30 29 6 4 R2 0 9 kg 3 Refrige...

Страница 18: ...nding on mode type RZQG71 RZQSG100 125 RZQG100 140 RZQSG140 Model Liquid piping Refrigerant piping length 5 10 m a b a For RZQG units only 3 10 m b For RZQG units only When piping length is less than...

Страница 19: ...t wiring Secure the earth wire to the stop valve attachment plate so that it does not slide Secure the earth wire to the stop valve attachment plate one more time along with the electric wiring and th...

Страница 20: ...esponsibility of the installer or user of the equipment to ensure by consultation with the distribution network operator if necessary that the equipment is connected only to a supply with a short circ...

Страница 21: ...the wiring as mentioned on the wiring diagram Make sure no wiring has been forgotten and that there are no missing phases or reverse phases Is the unit properly grounded Is the wiring between units co...

Страница 22: ...tector of this product only works during the initialisation stage after a power reset The reversed phase protection detector is designed to stop the product in case of an abnormality when the product...

Страница 23: ...or heat exchanger middle R6T Thermistor liquid R10T Thermistor fin RC V1B Signal receiver circuit S1PH High pressure switch TC V1B Signal transmission circuit V1R IGBT power module V1T V1B Insulated g...

Страница 24: ...4P327537 1 2012 08 Copyright 2012 Daikin...

Отзывы: