![Daikin Siesta ATXM20N2V1B Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/daikin/siesta-atxm20n2v1b/siesta-atxm20n2v1b_user-reference-manual_2460060014.webp)
4
|
Before operation
User reference guide
14
ATXM20~50N2V1B
Daikin room air conditioner
4P518786-2F – 2020.05
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Setting the brightness of the indoor unit display.
▪
Setting the clock.
▪
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1
Remove the front cover.
2
Insert both batteries at once.
3
Put back the front cover.
2
3
1
AAA.LR03
INFORMATION
▪
Low energy of battery is indicated by flashing of LCD display.
▪
ALWAYS replace both batteries at once.
4.3 To fix the user interface to the wall
c
b
a
2×
Содержание Siesta ATXM20N2V1B
Страница 1: ...User reference guide Daikin room air conditioner ATXM20N2V1B ATXM25N2V1B ATXM35N2V1B ATXM50N2V1B...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ...4P518786 2F 2020 05 Copyright 2018 Daikin Verantwortung f r Energie und Umwelt...