7 Commissioning

Installation and operation manual

22

RXYSQ4~Y1B

VRV IV-S system air conditioner

4P397284-1 – 2015.05

6.1.9

To connect the PC configurator to the
outdoor unit

V1

Y1

a

b

c (X41A)

A1P

a

b

X41A

A1P

2

3

4

5

H J

ST

a

PC

b

Cable (EKPCCAB)

c (X41A)

Extension cable connected to X41A

X41A

Connector

A1P

Outdoor unit main PCB

7

Commissioning

After installation and once the field settings are defined, the installer
is  obliged  to  verify  correct  operation.  Therefore  a  test  run  must  be
performed according to the procedures described below.

7.1

Precautions when commissioning

CAUTION

Do not perform the test operation while working on the
indoor units.

When  performing  the  test  operation,  not  only  the  outdoor
unit,  but  the  connected  indoor  unit  will  operate  as  well.
Working on an indoor unit while performing a test operation
is dangerous.

NOTICE

Be  sure  to  turn  on  the  power  6  hours  before  operation  in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

During test operation, the outdoor unit and the indoor units will start
up.  Make  sure  that  the  preparations  of  all  indoor  units  are  finished
(field  piping,  electrical  wiring,  air  purge,  ...).  See  installation  manual
of the indoor units for details.

7.2

Checklist before commissioning

After the installation of the unit, first check the following items. Once
all below checks are fulfilled, the unit must be closed, only then can
the unit be powered up.

You  read  the  complete  installation  and  operation
instructions,  as  described  in  the 

installer  and  user

reference guide

.

Installation

Check that the unit is properly installed, to avoid abnormal
noises and vibrations when starting up the unit.

Field wiring

Be  sure  that  the  field  wiring  has  been  carried  out
according  to  the  instructions  described  in  the  chapter

"5.7  Connecting  the  electrical  wiring"  on  page  14

,

according  to  the  wiring  diagrams  and  according  to  the
applicable legislation.

Power supply voltage

Check the power supply voltage on the local supply panel.
The  voltage  must  correspond  to  the  voltage  on  the
identification label of the unit.

Earth wiring

Be  sure  that  the  earth  wires  have  been  connected
properly and that the earth terminals are tightened.

Insulation test of the main power circuit

Using  a  megatester  for  500  V,  check  that  the  insulation
resistance  of  2  MΩ  or  more  is  attained  by  applying  a
voltage of 500 V DC between power terminals and earth.
Never use the megatester for the transmission wiring.

Fuses, circuit breakers, or protection devices

Check  that  the  fuses,  circuit  breakers,  or  the  locally
installed  protection  devices  are  of  the  size  and  type
specified 

in 

the 

chapter 

"4.3.1 

Safety 

device

requirements" on page 8

Be sure that neither a fuse nor a

protection device has been bypassed.

Internal wiring

Visually  check  the  electrical  component  box  and  the
inside  of  the  unit  on  loose  connections  or  damaged
electrical components.

Pipe size and pipe insulation

Be  sure  that  correct  pipe  sizes  are  installed  and  that  the
insulation work is properly executed.

Stop valves

Be  sure  that  the  stop  valves  are  open  on  both  liquid  and
gas side.

Damaged equipment

Check  the  inside  of  the  unit  on  damaged  components  or
squeezed pipes.

Refrigerant leak

Check the inside of the unit on refrigerant leakage. If there
is  a  refrigerant  leak,  try  to  repair  the  leak.  If  the  repair  is
unsuccessful,  call  your  local  dealer.  Do  not  touch  any
refrigerant  which  has  leaked  out  from  refrigerant  piping
connections. This may result in frostbite.

Oil leak

Check  the  compressor  for  oil  leakage.  If  there  is  an  oil
leak, try to repair the leak. If the repairing is unsuccessful,
call your local dealer.

Air inlet/outlet

Check  that  the  air  inlet  and  outlet  of  the  unit  is  not
obstructed  by  paper  sheets,  cardboard,  or  any  other
material.

Additional refrigerant charge

The amount of refrigerant to be added to the unit shall be
written  on  the  included  "Added  refrigerant"  plate  and
attached to the rear side of the front cover.

Installation date and field setting

Be  sure  to  keep  record  of  the  installation  date  on  the
sticker  on  the  rear  of  the  front  panel  according  to
EN60335‑2‑40 and keep record of the contents of the field
setting(s).

Содержание RXYSQ-TV1

Страница 1: ...lation and operation manual VRV IV S system air conditioner English Installation and operation manual VRV IV S system air conditioner RXYSQ4T7V1B RXYSQ5T7V1B RXYSQ6T7V1B RXYSQ4T7Y1B RXYSQ5T7Y1B RXYSQ6...

Страница 2: ...1700 1000 500 HU a b 100 100 c d e eB eD A B C D E HB HD A B C 200 300 1000 A B C E 200 300 1000 1000 500 D 1000 D E 1000 1000 500 B D HD HU 300 1000 HD HU 250 1500 HU HD HU 300 1500 B D E HB HD HB H...

Страница 3: ...normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nurodytus standartus ir arba kitus norminius dokumentus su s lyga kad yra naudojami pagal m s nurodymus tad j...

Страница 4: ...settings 17 6 1 2 To access the field setting components 17 6 1 3 Field setting components 17 6 1 4 To access mode 1 or 2 18 6 1 5 To use mode 1 18 6 1 6 To use mode 2 18 6 1 7 Mode 1 and default sit...

Страница 5: ...e installing Paper in the box of the outdoor unit Outdoor unit installation and operation manual Installation and operation instructions Installer and user reference guide Preparation of the installat...

Страница 6: ...keep the drain holes of the unit free by using proper equipment In heating T AO C WB a b 20 15 5 15 10 5 0 5 10 15 20 10 15 20 2527 30 TAI C DB a Warming up operation range b Operation range TAI Ambie...

Страница 7: ...o account Select the pipe size nearest to the required size Use the suitable adapters for the change over from inch to mm pipes field supply The additional refrigerant calculation has to be adjusted a...

Страница 8: ...acity index Refrigerant branch kit 182 KHRQ22M29H INFORMATION Maximum 8 branches can be connected to a header 4 3 Preparing electrical wiring 4 3 1 Safety device requirements The power supply must be...

Страница 9: ...f you install the unit on a frame install a waterproof plate within 150 mm of the bottom side of the unit in order to prevent the invasion of water in the unit and to avoid the drain water dripping se...

Страница 10: ...service port cover Tightening torques Stop valve size mm Tightening torque N m turn clockwise to close Shaft Valve body Hexagonal wrench Cap valve lid Service port 9 5 5 4 6 6 4 mm 13 5 16 5 11 5 13 9...

Страница 11: ...se This means that they will close Leak test and vacuum drying of field piping and indoor units is impossible when this happens Therefore there will be explained 2 methods for initial installation lea...

Страница 12: ...maximum operation pressure of the unit i e 4 0 MPa 40 bar 2 Test for leaks by applying a bubble test solution to all piping connections 3 Discharge all nitrogen gas NOTICE Make sure to use a recommen...

Страница 13: ...riginal amount of refrigerant refer to the nameplate on the unit and the determined additional refrigerant amount 5 6 2 To determine the additional refrigerant amount INFORMATION For final charge adju...

Страница 14: ...ion is detected during the procedure e g in case of closed stop valve a malfunction code will be displayed In that case refer to 5 6 4 Error codes when charging refrigerant on page 14 and solve the ma...

Страница 15: ...the electrical wiring Tightening torques Wiring Screw size Tightening torque N m Power supply wiring power supply shielded ground M5 2 2 2 7 Transmission wiring M3 5 0 8 0 97 5 7 4 To connect the ele...

Страница 16: ...s to prevent the edge of the knockout hole from cutting the wires a b c d e A B A Inside of the outdoor unit B Outside of the outdoor unit a Wire b Bush c Nut d Frame e Hose 6 Reattach the service cov...

Страница 17: ...quired to abort the special operation before normal operation can restart It will be indicated in below explanations 6 1 2 To access the field setting components See 5 1 1 To open the outdoor unit on...

Страница 18: ...t confused in the middle of the process press BS1 to return to the default situation 6 1 5 To use mode 1 In mode 1 and in default situation you can read out some information Example 7 LEDs display Def...

Страница 19: ...mitation can be set in mode 2 There are two methods to activate power consumption limitation of the outdoor unit system The first method is to enable a forced power consumption limitation by field set...

Страница 20: ...tion was not aborted by pushing BS3 the unit will stop its operation after 30 minutes If 30 minutes was not sufficient to add the needed refrigerant amount the function can be reactivated by changing...

Страница 21: ...n an external signal is sent to the unit this setting defines the level power consumption limitation that will be applied for step 2 The level is according to the table 30 default 40 50 2 32 Forced al...

Страница 22: ...local supply panel The voltage must correspond to the voltage on the identification label of the unit Earth wiring Be sure that the earth wires have been connected properly and that the earth terminal...

Страница 23: ...ntralised control will display on the user interface of indoor units Steps during the automatic system test run procedure Step Description Control before start up pressure equalisation Cooling start u...

Страница 24: ...circuit A1P X12A Check connection on PCB or actuator Suction temperature sensor malfunction R3T A1P X12A R5T A1P X12A Check connection on PCB or actuator Liquid temperature sensor coil malfunction R4T...

Страница 25: ...ice space between the unit and obstacles A B C D and E eB Maximum distance between the unit and the edge of obstacle E in the direction of obstacle B eD Maximum distance between the unit and the edge...

Страница 26: ...installation manual for indoor outdoor transmission F1 F2 wiring 6 When using the central control system connect outdoor outdoor transmission F1 F2 Notes for RXYSQ4 6_Y1 1 Symbols see below 2 For X37...

Страница 27: ...stor air R2T Thermistor discharge R3T Thermistor suction 1 R4T Thermistor heat exchanger R5T Thermistor suction 2 R6T Thermistor subcool heat exchanger R7T Thermistor liquid pipe R10T Thermistor fin S...

Страница 28: ...d user interface To protect the unit turn on the main power switch 6 hours before operation If the main power supply is turned off during operation operation will restart automatically after the power...

Страница 29: ...t changeover remote control switch To start 1 Press the operation mode selector button on the user interface several times and select program dry operation 2 Press the ON OFF button of the user interf...

Страница 30: ...y the master user interface Only the master user interface can select heating or cooling mode 12 5 2 To designate the master user interface VRV DX In case only VRV DX indoor units are connected to the...

Страница 31: ...off the main power switch If water leaks from the unit Stop the operation The operation switch does not work well Turn off the power Malfunction Measure If the user interface display indicates the uni...

Страница 32: ...door Abnormal user interface indoor communication Faulty wiring to outdoor outdoor Abnormal main sub user interface communication System mismatch Wrong type of indoor units combined Indoor unit malfun...

Страница 33: ...nge make this noise A low sah choro choro sound is heard while the indoor unit is stopped When another indoor unit is in operation this noise is heard In order to prevent oil and refrigerant from rema...

Страница 34: ......

Страница 35: ......

Страница 36: ...4P397284 1 0000000V 4P397284 1 2015 05 Copyright 2015 Daikin...

Отзывы: