6
|
Unit installation
Installer reference guide
30
4 35 35
3 RXTA30N2V1B
R32 split series
4P518023-7H – 2020.08
6.3.2 Precautions when mounting the outdoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"6.1 Preparing the installation site"
6.3.3 To provide the installation structure
Check the strength and level of the installation ground so that the unit will not
cause any operating vibration or noise.
Use a vibration-proof rubber (field supply) in cases where vibrations may be
transmitted to the building.
Fix the unit securely by means of foundation bolts in accordance with the
foundation drawing.
Prepare 4 sets of M8 or M10 anchor bolts, nuts and washers (field supply).
20 mm
330
524
211
(mm)
211
a
a
100 mm above expected level of snow
Содержание RXTA-N
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...4P518023 7H 2020 08 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...