12
|
Commissioning
Installer reference guide
57
RXF50~71D5V1B
R32 split series
4P519439-15Q – 2021.10
12 Commissioning
In this chapter
12.1 Precautions when commissioning
DANGER: RISK OF ELECTROCUTION
DANGER: RISK OF BURNING/SCALDING
CAUTION
Do NOT perform the test operation while working on the indoor units.
When performing the test operation, NOT ONLY the outdoor unit, but the connected
indoor unit will operate as well. Working on an indoor unit while performing a test
operation is dangerous.
CAUTION
Do NOT insert fingers, rods or other objects into the air inlet or outlet. Do NOT
remove the fan guard. When the fan is rotating at high speed, it will cause injury.
NOTICE
Be sure to turn ON the power 6 hours before operation in order to have power
running to the crankcase heater and to protect the compressor.
During test operation, the outdoor unit and the indoor units will start up. Make
sure that the preparations of all indoor units are finished (field piping, electrical
wiring, air purge, ...). See installation manual of the indoor units for details.
12.2 Checklist before commissioning
After the installation of the unit, first check the items listed below. Once all checks
are fulfilled, the unit MUST be closed. Power-up the unit after it is closed.
The
indoor unit
is properly mounted.
The
outdoor unit
is properly mounted.
The system is properly
earthed
and the earth terminals are tightened.
The
power supply voltage
matches the voltage on the identification label of the unit.
There are NO
loose connections
or damaged electrical components in the switch box.
Содержание RXF50D5V1B
Страница 1: ...Installer reference guide R32 split series RXF50D5V1B RXF60D5V1B RXF71D5V1B ...
Страница 22: ...4 About the box Installer reference guide 22 RXF50 71D5V1B R32 split series 4P519439 15Q 2021 10 1 2 ...
Страница 73: ......
Страница 74: ......
Страница 75: ......