background image

9

English

Wiring

 WARNING

1) Do not use tapped wires, stranded wires, extension cords, or starburst connections, as they may cause overheating, electrical 

shock, or fire.

2) Do not use locally purchased electrical parts inside the product. (Do not branch the power for the drain pump, etc., from the 

terminal block.) Doing so may cause electric shock or fire.

3) Be sure to install an earth leakage breaker. (One that can handle higher harmonics.)

(This unit uses an inverter, which means that it must be used an earth leakage breaker capable handling harmonics in order to 
prevent malfunctioning of the earth leakage breaker itself.)

4) Use an all-pole disconnection type breaker with at least 3mm between the contact point gaps.

5) Do not connect the power wire to the indoor unit. Doing so may cause electric shock or fire.

• Do not turn ON the safety breaker until all work is completed.

1) Strip the insulation from the wire (20mm).

2) Connect the connection wires between the 

indoor and outdoor units 

so that the termi-

nal numbers match.

 Tighten the terminal 

screws securely. We recommend a flathead 
screwdriver be used to tighten the screws. 
The screws are packed with the terminal 
board.

Observe the notes mentioned below when wiring to the power supply ter-
minal board.
Precautions to be taken for power supply wiring. 
Use a round crimp-style terminal for connection to the power supply  ter-
minal board. In case it cannot be used due to unavoidable reasons, be 
sure to observe the following instruction.
Place the round crimp-style terminals on the wires up to the covered part 
and secure in place.

1
2
3

1 2 3

L N

Safety 
breaker 
16A

Earth leakage 
circuit breaker

Earth

When wire length exceeds 10m, 
use 2.0mm diameter wires.

H05RN

Firmly fix the wires with 
the terminal screws.

Outdoor unit

Indoor 
unit

Power supply
50Hz 220-240V

Firmly fix the wires with 
the terminal screws.

Use 2.0mm diameter wires.

1

2

3

1

2

3

Use the specified wire type and 
connect it securely.

Firmly secure 
wire retainer so 
wire terminations 
will not receive 
external stress.

Shape wires so 
that the stop 
valve cover fit 
securely.

Power supply
terminal block

Stranded Wire

Round crimp-style
terminal

1-3

A

B

A<B

Содержание RX20JV1B

Страница 1: ...stallation manual R410A Split series Montaj k lavuzlar R410A Split serisi Installationsanleitung Split Baureihe R410A Manuel d installation S rie split R410A Montagehandleiding R410A Split systeem Man...

Страница 2: ...Voltage 2006 95 EC Electromagnetic Compatibility 2004 108 EC 3P Takayuki Fujii Managing Director 1st of 201 IKIN TCF 015 201 RX20J RX25J V1B RX35J V1B DEKRA NB0344 74736 KRQ EMC97 4957 U Nove hospody...

Страница 3: ...shape the cables so that they do not put undue force on the electrical covers or panels Install covers over the wires Incomplete cover installation may cause terminal overheating electrical shock or...

Страница 4: ...nding on radio wave conditions 8 In coastal areas or other places with salty atmosphere of sulfate gas corrosion may shorten the life of the air conditioner 9 Since drain flows out of the outdoor unit...

Страница 5: ...onal refrigerant required for refrigerant pipe exceeding 10m in length Be sure to add the proper amount of additional refrigerant Failure to do so may result in reduced perfomance The suggested shorte...

Страница 6: ...oundation surface Outdoor Unit Installation 1 Installing outdoor unit 1 When installing the outdoor unit refer to Precautions for Selecting the Location and the Outdoor Unit Installation Draw ings 2 I...

Страница 7: ...410A 3 Use torque wrenches when tightening the flare nuts to prevent damage to the flare nuts and gas leakage Align the centres of both flares and tighten the flare nuts 3 or 4 turns by hand Then tigh...

Страница 8: ...hose which comes from gauge manifold to gas stop valve s service port 2 Fully open gauge manifold s low pressure valve Lo and completely close its high pressure valve Hi High pressure valve subsequen...

Страница 9: ...d piping and to provide insulation dimensions as below 3 Use separate thermal insulation pipes for gas and liquid refrigerant pipes Gas side Liquid side Gas pipe thermal insulation Liquid pipe thermal...

Страница 10: ...force a test run to stop press the indoor unit operation stop button Using the main unit s remote controller 1 Press the operation stop button Operation will start 2 Press the temperature button and t...

Страница 11: ...that the termi nal numbers match Tighten the terminal screws securely We recommend a flathead screwdriver be used to tighten the screws The screws are packed with the terminal board Observe the notes...

Страница 12: ...sure to perform curling Problems with the work may cause heat and fires 3 Pull the wire and make sure that it does not disconnect Then fix the wire in place with a wire stop Strip wire end to this poi...

Страница 13: ...operation in accordance with the operation manual to ensure that all functions and parts such as louver movement are working properly The air conditioner requires a small amount of power in its stand...

Страница 14: ...12 T rk e MEMO...

Страница 15: ...3P U Nove hospody 1 1155 301 00 Plzen Skvrnany Czech republic Zandvoordestraat 300 B 8400 Ostende Belgium www daikineurope com...

Отзывы: