RTSYQ10PY1
RTSYQ14PY1
RTSYQ16PY1
RTSYQ20PY1
TWO-STAGE COMPRESSION
VRV System air conditioner
Installation manual
1
English
CONTENTS
1. FIRST OF ALL ......................................................................... 1
1-1. Safety precautions ............................................................ 1
1-2. Special notice of product................................................... 2
1-3. Disposal requirements ...................................................... 2
2. INTRODUCTION...................................................................... 2
2-1. About product.................................................................... 2
2-2. Technical and Electrical specifications ............................. 3
2-3. Main components.............................................................. 3
2-4. Combination ...................................................................... 3
2-5. Standard supplied accessories ......................................... 3
2-6. Option accessory .............................................................. 3
3. SELECTION OF LOCATION ................................................... 4
4. INSPECTING AND HANDLING THE UNIT ............................. 4
5. PLACING THE UNIT................................................................ 5
6. REFRIGERANT PIPING .......................................................... 5
6-1. Selection of piping material and Refrigerant
branching kit...................................................................... 5
6-2. Protection against contamination when installing pipes.... 5
6-3. Pipe connection ................................................................ 5
6-4. Connecting the refrigerant piping ...................................... 6
6-5. Example of connection...................................................... 9
7. FIELD WIRING ...................................................................... 12
7-1. Power circuit, safety device and cable requirements ...... 12
7-2. Wiring Connection Example for Whole System .............. 12
7-3. Leading wire Procedure .................................................. 13
7-4. Transmission Wiring Connection Procedure................... 13
7-5. Power Wiring Connection Procedure .............................. 13
7-6. Procedure for Wiring Inside Units ................................... 14
8. TESTS AND INSULATION WORK ........................................ 14
8-1. Air tight test and vacuum drying...................................... 14
8-2. Pipe insulation................................................................. 15
8-3. Checking of device and installation conditions ............... 15
9. ADDITIONAL REFRIGERANT CHARGE AND
CHECK OPERATION ............................................................ 16
9-1. Before working ................................................................ 16
9-2. Procedure of Additional Refrigerant charging ................. 18
9-3. Procedure of check operation ......................................... 20
10. ONSITE SETTINGS............................................................... 20
11. TEST RUN ............................................................................. 21
11-1. Before test run............................................................... 21
11-2. Test Run........................................................................ 21
11-3. Checks After Test Run .................................................. 21
12. CAUTION FOR REFRIGERANT LEAKS ............................... 21
1.
FIRST OF ALL
•
This document is an installation manual for the Daikin RTSYQ-P
Series VRV Inverter. Before installing the unit, read this manual
thoroughly, and following the instructions contained in it.
•
After installation, do a test run to make sure the unit runs properly,
and then explain how to operate and take care of the unit to the
customer, using the operation manual.
•
Lastly, make sure the customer keeps this manual, along with the
operation manual, in a safe place.
1-1 Safety precautions
•
Please read these “Safety precautions” carefully before installing
air conditioning unit and be sure to install it correctly.
•
After completing installation, conduct a trial operation to check for
faults and explain to the customer how to operate the air condi-
tioner and take care of it with the aid of the operation manual.
Ask the customer to store the installation manual along with the
operation manual for future reference.
Meaning of WARNING and CAUTION notices
Warning
........Failure to follow these instructions properly may
result in personal injury or loss of life.
Caution
.........Failure to observe these instructions properly
may result in property damage or personal
injury, which may be serious depending on the
circumstances.
Warning
•
Ask your dealer or qualified personnel to carry out installation work.
Do not attempt to install the air conditioner yourself. Improper
installation may result in water leakage, electric shocks or fire.
•
Install the air conditioner in accordance with the instructions in
this installation manual.
Improper installation may result in water leakage, electric shocks or fire.
•
When installing the unit in a small room, take measures against to
keep refrigerant concentration from exceeding allowable safety
limits in the event of refrigerant leakage.
Contact the place of purchase for more information. Excessive
refrigerant in a closed ambient can lead to oxygen deficiency.
•
Be sure to use only the specified accessories and parts for instal-
lation work.
Failure to use the specified parts may result in the unit falling,
water leakage, electric shocks or fire.
•
Install the air conditioner on a foundation strong enough to with-
stand the weight of the unit.
A foundation of insufficient strength may result in the equipment
falling and causing injury.
•
Carry out the specified installation work after taking into account
strong winds, typhoons or earthquakes.
Failure to do so during installation work may result in the unit fall-
ing and causing accidents.
•
Make sure that a separate power supply circuit is provided for this unit
and that all electrical work is carried out by qualified personnel accord-
ing to local and national regulations and this installation manual.
An insufficient power supply capacity or improper electrical con-
struction may lead to electric shocks or fire.
•
Be sure to earth the air conditioner.
Do not earth the unit to a utility pipe, lightning conductor
or telephone earth lead. Imperfect earthing may result in
electric shocks or fire.
A high surge current from lightning or other sources may cause
damage to the air conditioner.
•
Be sure to install an earth leakage breaker.
Failure to install an earth leakage breaker may result in electric
shocks or fire.
•
Be sure to switch off the unit before touching any electrical parts.
•
Make sure that all wiring is secured, the specified wires are used,
and that there is no strain on the terminal connections or wires.
Improper connections or securing of wires may result in abnormal
heat build-up or fire.
•
When wiring the power supply and connecting the remote control-
ler wiring and transmission wiring, position the wires so that the
EL. COMPO. BOX lid can be securely fastened.
Improper positioning of the EL. COMPO. BOX lid may result in
electric shocks, fire or the terminals overheating.
•
If refrigerant gas leaks during installation, ventilate the area
immediately.
Toxic gas may be produced if the refrigerant comes into contact
with fire.
•
After completing installation, check for refrigerant gas leakage.
Toxic gas may be produced if the refrigerant gas leaks into the
room and comes into contact with a source of fire, such as a fan
heater, stove or cooker.
•
Do not directly touch refrigerant that has leaked from refrigerant
pipes or other areas, as there is a danger of frostbite.
•
Do not allow children to climb on the outdoor unit or function unit
and avoid placing objects on the unit.
Injury may result if the unit becomes loose and falls.
01_EN_3P201178-10P.fm Page 1 Wednesday, September 2, 2009 11:10 AM