Maintenance
EN
22
FA Daikin/ROTEX PG - 05/2017
008.15 442 44_01 - EN
8
Maintenance
8.1
Maintenance intervals
8.2
Maintenance activities
8.2.1
Replacing a defective circulation pump
1. Close the red thermometer ball valve and the ball valve in the pump line
(90° setting).
2. Replace the circulation pump (see instructions of the manufacturer of
the pump).
3. Open the thermometer ball valve and the ball valve (0° setting).
When
Activity
Monthly
Perform a visual inspection of the heating system
and verify tightness.
If required
Replace the circulation pump.
DANGER
ELECTRIC SHOCK CAUSED BY LIVE PARTS
•
Disconnect the mains voltage supply before performing the work and ensure
that it cannot be switched on.
Failure to follow these instructions will result in death or serious injury.
Содержание Rotex PGDK
Страница 25: ......