3.6.13 Screed Program

The Screed Program is intended exclusively for specified drying 
of newly created screed in underfloor heating systems. This op-
erates the heat generator for several days according to a prede-
fined temperature profile (the predefined temperature profile is 
based on the recommendations of the Bundesverbandes 
Flächenheizungen (Federal Association of Surface Heating 
Systems) for heating to cure the floor).

The temperatures and the duration of the Screed Program can be 
adjusted as required, after entering the expert code, in the rotary 
switch setting 

"Configuration"

 

 in the level 

"HC Configu-

ration"

 in the parameter [Screed Program].

The

 Screed Program

 is a special function and is not interrupted 

by any other operating mode. It can be activated 

only

 by the 

heating expert

 for the 

direct heating circuit

 and/or the op-

tionally connected mixed heating circuits. Each heating circuit 
must be separately activated.

Prior to start of the Screed Program, the parameters 
[Interlink fct] and [Room thermostat] must have been 
deactivated.

In the event of a brief power failure the system contin-
ues with a previously activated screed function in place 
of shutting down.

After activation of the Screed Program (parameter [Screed] = On) 
all the weather-controlled regulating functions of the relevant 
heating circuit are switched off. The relevant heating circuit op-
erates independently of the operating mode (switching times) as 
a constant temperature regulator.

An already started Screed Program can be deactivated at any 
time. At the end of Screed Programs the screed function the pa-
rameter is automatically set to "Off" and the heating circuit once 
again operates according to the currently set operating mode.

Function heating

Function heating verifies that the installation is fault-free for the 
heating engineer. A pre-prepared heating up protocol for Daikin 
underfloor heating can be found in the Daikin Internet portal.

In this case, function heating (identical with "Heating up" in 
EN 1264, section 5.2) does not constitute a heating up process 
for drying and curing. Normally you need to carry out separate 
heating process to cure the floor and/or performmechanical 
drying.

Heating up should be carried out no earlier than after 21 days for 
cement screed, and no earlier than after 7 days for anhydrite 
screed in accordance with the details provided by the manufac-
turer. The first heating up starts at a feed temperature of 25 °C, 
which must be maintained for a period of 3 days. Then heating is 
carried out at the maximum flow temperature set for the heating 
circuit (limited to max. 55 °C) and this is then held for a further 4 
days.

After the heating up process described, there is no guarantee that 
the screed has achieved the moisture content required to cure 
the floor.

You must determine the moisture content in the screed by meas-
urement before laying the floor covering.

Procedure in accordance with EN 1264 Part 4:

The heating circuits must be checked for leaks by a 
water pressure test once the anhydrite and cement 
screeds are completed. The absence of leaks must be 
ensured immediately before and during screed laying. 
The level of the test pressure is at least 1.3 times the 
maximum permissible operating pressure.

If there is a danger of freezing up, you must take suita-
ble measures, e.g. the use of antifreeze or temperature 
control in the building. If antifreeze is no longer required 
for intended use of the installation, you must remove 
the antifreeze by draining it out and flushing the instal-
lation with at least 3 changes of water.

t

1

Starting temperature 25 °C

t

2

Maximum heating circuit temperature

t

V

Flow temperature

Z

Duration of screed function, in days, after function start

Fig. 3-18 Sequence of timings of the Screed Program for function 

heating

Ready-to-apply heating

The drying out procedure for the screed cannot be predicted ex-
actly in advance. At higher humidity levels in the air this can come 
to a complete stop under certain circumstances stop under 
certain circumstances. The drying out process may be accel-
erated by running the underfloor heating (curing heating) or by 
using measures such as mechanical drying.

Every curing heating process must be commissioned, separately 
by the building owner as an extra service in accordance with 
VOB. For the flooring contractor to achieve fault-free installation, 
the flooring must be properly cured before work is started on the 
top flooring layer.

The standard settings can be used to activate the combined 
function and curing heating programme in order to achieve a re-
sidual moisture level in the screed required for curing the floor 
(see fig. 3-19). The residual moisture level in the screed must, 
however, always be checked by measurement before the floor 
covering is laid.

Fig. 3-19 The time sequence of the Screed Program in combined func-

tion and curing heating (for legend see fig. 3-18)

More detailed explanations and possible setting values for this function can be seen 
in chapters 5.2.3
 and 5.13.2.

Содержание RoCon HP

Страница 1: ...Operating instructions Daikin RoCon HP EHS157034 EHS157068 Daikin Control RoCon HP EHS157034 EHS157068 Operating instructions Daikin Control RoCon HP EHS157034 EHS157068 English...

Страница 2: ...irculation pump 27 3 6 16 Remote control via Internet 27 4 Initial start up 28 4 1 Starting up the Daikin Altherma EHS X H 28 4 2 Connect the optional RoCon devices and start them up 28 4 2 1 Starting...

Страница 3: ...rning can lead to damage to property and the environment This symbol identifies user tips and particularly useful information but not warnings or hazards Special warning signs Some types of danger are...

Страница 4: ...Daikin RoCon HP may only operated only according to the indications in this manual Any other use outside the intended use is considered as im proper The operator alone shall bear responsibility for an...

Страница 5: ...used to carry out different control functions in conjunction with external devices demand from an external heat generator switching to bivalent operating mode external status display etc In addition i...

Страница 6: ...ements 3 2 1 Display All the operating steps are supported by appropriate displays in the clear text display on a coloured background Menu guiding is available in 7 different languages see section 3 4...

Страница 7: ...rm accept selection and execute the function Tab 3 3 Functions of the rotary switch 2 3 Temporary timer programme Away active see section 3 4 7 2 3 Temporary timer programme Holiday active see section...

Страница 8: ...ally shows the standard display with rotary switch position In the first commissioning the setting for language selection is displayed first Select the language using the rotary switch Confirm the cha...

Страница 9: ...n the Info position Standard display is shown see fig 3 2 Press the rotary switch briefly The parameter overview is displayed Select the desired information level with the rotary switch Confirm the ch...

Страница 10: ...be changed by the heating technician If the water pressure falls below the minimum value set parameter value it must be increased by topping up the system see installation instructions of the Daikin...

Страница 11: ...bove the frost protection limit In the Standby operating mode the heat pump and any optionally connected backup heaters are isolated from the power supply Energy saving mode when the following conditi...

Страница 12: ...setting Note DHW Install DHW Install Section 3 4 6 Party Time Program Section 3 4 7 Away Holiday Vacation Screed Configuration HC Configuration Section 3 6 13 Only with expert code Tab 3 7 Overview o...

Страница 13: ...itching time program Various different timer programmes are available that are set in the factory but which can be adjusted to suit to provide conven ient and individual room and hot water temperature...

Страница 14: ...mme see also tab 3 8 1 timer programme for one optionally connected circula tion pump with 3 individual possible switching cycles Circulation Time The setting and input structure of the timer programm...

Страница 15: ...ionally connected components in the rotary switch setting Configuration Depending on access authority user or expert various different parameters are available Certain parameters are only acces sible...

Страница 16: ...he control element at the level Remote Param the parameter No selection must be selected and acknowl edged see fig 3 10 3 4 10 Quite Mode Quite Mode means that the exterior heat pump unit is operating...

Страница 17: ...to be started with the rotary switch Confirm the changes with a brief push of the rotary switch The selected programme starts Cancellation and jump back by pushing the exit button again or briefly act...

Страница 18: ...thermostat On or parame ter Interlink fct On the overheat protection switch must be connected so that the switching contact of the room thermostat is interrupted If the underfloor heating system is al...

Страница 19: ...system by conden sation Before initial commissioning and activation of cooling operation set the maximum permissible system temperature in the minimum temperature limit in the Control RoCon HP paramet...

Страница 20: ...eating circuit as a a Mixer extension The outside temperature determined by the outside temperature sensor connected to the Daikin Altherma EHS X H is transmitted to the mixer module via the CAN bus o...

Страница 21: ...get temperature normal inflow target temperature value of parameter T Flow CH adj Priority if both switch ing contacts are closed c Cooling operating mode active Closed switching contact heating IL1 T...

Страница 22: ...of use The minimum value THZUmin is calculated as follows THZUmin current active target hot water temperature T DHW Setpoint parameter TDiff DHW CH Support Switch on condition Tdhw THZUmin 4 K and Td...

Страница 23: ...Select the Air Purge parameter using the rotary switch 3 Confirm the changes with a brief push of the rotary switch The setting for the parameter is displayed 4 Using the rotary switch set the parame...

Страница 24: ...el is displayed after entering 2 Press the exit button for at least 5 s Menu Special Level is displayed 3 Select the programme Reset with the rotary switch 4 Execute the programme by briefly pressing...

Страница 25: ...provided by the manufac turer The first heating up starts at a feed temperature of 25 C which must be maintained for a period of 3 days Then heating is carried out at the maximum flow temperature set...

Страница 26: ...65 C The steps are 1 C Day Factory setting Day Factory setting 1 3 25 C 10 19 55 C 4 7 55 C 20 40 C 8 25 C 21 25 C 9 40 C 22 26 Tab 3 11 Presettings Screed Program Press the Exit key briefly An overv...

Страница 27: ...ion pump operates according to its own timer programme b Together with a hot water timer programme The circulation pump is actuated in parallel with the operating periods of the hot water timer progra...

Страница 28: ...For greater lengths use larger cross section areas Commercially available junction boxes can be used for con nection of Can bus lines of several RoCon devices Ensure power cables sensor cables and dat...

Страница 29: ...e the rotary switch to set the desired operating function for the room station Living Room Operating function see a c d Mixing Valve Operating function see b Solar Module Currently not available Depen...

Страница 30: ...er see fig 4 1 Make sure not to assign a duplicate value as the setting of the Terminaladress parameter 1 Display date 2 Status display Screed func tion active 3 Status display Technician login 4 Disp...

Страница 31: ...Access Rights Entering access code Setting character by character like a combination lock see chapter 3 6 1 E E 0 9 0000 1 RoCon U1 assign Display only on connected room station Function of the EHS15...

Страница 32: ...contact closed standard tariff 1 NC contact switching contact closed off peak tariff N E 0 1 0 Room thermostat Configuration of a room thermostat connected to the port J16 on the Daikin Altherma EHS...

Страница 33: ...evaluation On Sensor evaluation activated if no pressure sensor is connected a fault message is generated N E Off On On Outside Temp Adap Individual adapting for the measured value of the outdoor temp...

Страница 34: ...ing support 4 When there is a malfunction 5 When sensor value TVBH 60 C 6 When the outdoor temperature parameter value Equilibrium Temp Heat pump continues to operate Parallel bivalence operation 7 Wh...

Страница 35: ...ow Normal Good Very Good low Screed Function for screed drying Off Deactivated On The flow temperature is regulated according to the set screed programme The day on which the screed function is activa...

Страница 36: ...e is interrupted the function pauses until it is performed successfully on the next day or until it is ended by setting the parameter to Off or by changing the current operating mode The hot water gen...

Страница 37: ...threshold hot water charging Setting of the temperature difference to which the temperature in the domestic hot water stor age tank compared to the current target hot water temperature T DHW Setpoint...

Страница 38: ...ge Min Max Factory setting Increment BE HF T Reduced Target room temperature for the setback times for the permanent timer programmes Automatic 1 and Automatic 2 E E 5 40 C 15 C 0 5 C T Absence Target...

Страница 39: ...nd Monday to Sunday E E See chapter 3 4 7 See tab 3 9 15 min DHW Program 1 In this menu we can parametrise the 1st timer programme for hot water generation 3 switching cycles with a resolution of 15 m...

Страница 40: ...e direct heating circuit is displayed in C S S 0 100 C 0 1 C T HC Setpoint The set temperature of the flow in the direct heating circuit is displayed in C S S 0 90 C 0 1 C Status HS pump The current s...

Страница 41: ...itch position Configuration level Setup the parameter System Config has been set to inac tive or delete Parameter Description Access Setting range Min Max Factory setting Increment BE HF Boiler Functi...

Страница 42: ...is calculated automatically from the date E E Time Time in format hours minutes E E Keylock Function Release of the keylock function Off Button block cannot be activated On The button block can be ac...

Страница 43: ...to heating programme 3 Mixer circuit pump in continuous running mode N E 0 3 0 1 T Outside lim day Only if parameter Pump Mode 1 Setting the automatic summer shutdown of the heating system If the out...

Страница 44: ...a cooling function Only if parameter HC Function 0 Setting to determine from which outdoor temperature the lowest cooling flow temperature T Flow Cooling max is stipulated setting condition operating...

Страница 45: ...us address of the unit causing the fault Fig 6 2 Display of a current error message heat pump fault 6 1 2 Read Protocol The Protocol can be read in the Special Level see fig 6 3 The last received mess...

Страница 46: ...T Info Overview Water Pressure T HS Sw Nr B1 U1 Sw Nr RTX RT Sw Nr Controller Info Sw Nr B1 U1 Sw Nr Controller Sw Nr RTX RT Fig 6 4 Software information of the controller components Operating instruc...

Страница 47: ...l in the heat exchanger Heat pumping process In a closed coolant circuit the coolant absorbs heat from the surrounding air Compressing this coolant results in a higher temperature which can then be tr...

Страница 48: ...t ____ C Time period On Off On Off On Off HC Program 1 Monday Tuesday Wednesday Thursday Friday Saturday Sunday HC Program 2 Monday Tuesday Wednesday Thursday Friday Saturday Sunday Tab 8 1 Individual...

Страница 49: ...tching time programme 8 x Notes Daikin RoCon HP Daikin Control 008 1420844 05 2014 Operating instructions 49 8 2 Parameter Enter your parameter changes in the table below Rotary switch setting Paramet...

Страница 50: ...Operating instructions 50 Daikin RoCon HP Daikin Control 008 1420844 05 2014 8 x Notes 8 3 Other items...

Страница 51: ...ating mode 18 With weather dependent regulation 20 Information messages 41 45 L Language setting 15 Low tariff mains connection 47 M Malfunctions 45 Manual operation 17 Mixer module 20 28 N Normal ope...

Страница 52: ...008 1420844_08 05 2014 Copyright Daikin...

Отзывы: