background image

REYQ8~16P8Y1B
VRVIII System air conditioner
4PW39996-1B

Installation manual

19

9.

Complete

The display on the remote controller shows a flashing

  PE

  code

for signalling that automatic charging will be finished in about 10
minutes.
When the unit stops operating, close valve A immediately and
check the LEDs and check if the 

P9

  code is displayed on the

remote controller.

If the LED indication is not as shown above, correct the
malfunction (as indicated in the display of the remote controller)
and restart the complete charging procedure. When the
charging amount is little, the 

PE

 code may not be displayed, but

instead the 

P9

 code will be displayed immediately.

10. In case leak detection function required

Press the 

 button once for post-processing with

regard to the leak detection function and press the 
button to confirm that charging is completed. 
Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure 

"11.6. 

Procedure for inputting the

additional refrigerant charge weight into the PCB"

 as described

on 

page 19

.

10. In case leak detection function not required

Press the 

 button once and the charging is complete. 

Record the amount that was added on the additional refrigerant
charge label provided with the unit and attach it on the back side
of the front panel.
Perform the procedure 

"11.6. 

Procedure for inputting the

additional refrigerant charge weight into the PCB"

 as described

on 

page 19

.

2

Normal system display

3

Remote controller malfunction code display

Remote controller heating mode malfunction codes

Remote controller cooling mode malfunction codes

11.6. Procedure for inputting the additional 

refrigerant charge weight into the PCB

Availability of the leak detection function feature requires input of the
additional refrigerant charge amount immediately after finishing the
automatic charging. The input must be executed before performing
the test operation.

Procedure

1

Close the electric box lid and all front panels except the one on
the side of the electric box.

2

Press and hold the 

 button for 5 seconds to enter into

setting mode 2. 

The H1P LED is on 

w

.

3

Press the 

 button 14 times.

The LED display must be as follows:

Press the 

 button once as confirmation of the

LEDs combination.
LEDs will be blinking in function of the last entered setting
(factory setting = 0 kg).

H1P

H2P

H3P

H4P

H5P

H6P

H7P

c c c w w w w

NOTE

Always close valve A and remove the refrigerant
tank immediately after finishing the refrigerant
charge operation.

The refrigerant charge port of these units have
electric expansion valves that will close
automatically when refrigerant charging operation
has finished. However, the electric expansion
valves will be opened when other operations start
after finishing refrigerant charging operation.

If the refrigerant tank is left with the valve open,
the amount of refrigerant which is properly
charged may be off the point.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w c c w w w w

Beware of the fan blades when you open the front panel.
The fan may still rotate for a while after unit operation has
stopped.

LED display

(Default status

before delivery)

Micro-

computer
operation

monitor

Mode

Ready

/Error

Cooling/Heating 

changeover

Low 

noise

Demand

Indivi-

dual

Bulk 

(master)

Bulk 

(slave)

HAP

H1P

H2P

H3P

H4P

H5P

H6P

H7P

Outdoor unit system

c

x

x

w

x

x

x

x

BS4  TEST

BS1  MODE

BS1  MODE

Error code 

P8 

recharge 
operation

Close valve A immediately and press the TEST OPERATION 
button once.
The operation will restart from the charging mode judgement 
onwards.

P2

charge 
hold

Close valve A immediately. Check 
following items:
- Check if the gas stop valve is opened 

correctly

- Check if the valve of the refrigerant 

cylinder is opened

- Check if the air inlet and outlet of the 

indoor unit are not obstructed

After correcting the 
abnormality, restart 
the automatic 
charging procedure 
again.

Error code 

PE

Charging is almost finished. Ready to close valve A.

P9

Charging is finished. Close valve A and remove the refrigerant 
tank.

PA

PH

replace 
cylinder

Close valve A and replace the empty cylinder. 
After replacing the cylinder, open valve A again and continue the 
work (the outdoor unit will not stop operating).

P8 

recharge 
operation

Close valve A immediately.
Restart the automatic charging procedure again.

P2

charge 
hold

Close valve A immediately. Check 
following items:
- Check if the high pressure/low 

pressure gas pipe, suction gas pipe 
and liquid pipe stop valves are opened 
correctly

- Check if the valve of the refrigerant 

cylinder is opened

- Check if the air inlet and outlet of the 

indoor unit are not obstructed

After correcting the 
abnormality, restart 
the automatic 
charging procedure 
again.

*
abnormal 
stop

Close valve A immediately. Confirm the 
malfunction code by the remote controller 
and correct the abnormality by following 
the 

"Correcting after abnormal completion 

of the test operation" on page 24

.

If a wrong value is input for the additional charged
refrigerant weight, the accuracy of the leak detection
function will decrease.

H1P

H2P

H3P

H4P

H5P

H6P

H7P

w x

x w w w x

BS1  MODE

BS2  SET

BS3  RETURN

Содержание REYQ10REYQ

Страница 1: ...INSTALLATION MANUAL REYQ8P8Y1B REYQ10P8Y1B REYQ12P8Y1B REYQ14P8Y1B REYQ16P8Y1B System air conditioner ...

Страница 2: ...mm e 100 mm f 500 mm 4 a 10 mm b 300 mm c 10 mm d 500 mm e 20 mm a 50 mm b 100 mm c 50 mm d 500 mm e 100 mm 1500 500 13 2 1 6 3 4 6 5 6 9 10 7 8 2 1 A B C 5 3 2 1 6 4 3 4 2 b a c d A C B D a e b d e A C B D 1500 1 3 5 4 2 2 mm 6 3 1 0 0 0 1 0 0 0 1000 1 50 0 1500 1500 729 765 765 631 1300 1162 1 2 4 5 6 7 3 12 1 1 2 1 5 11 6 c a c e b d f A C B D 3 a c e b b d A C B D 4 1 2 9 8 4 4 4 2 2 4 4 3 2 3...

Страница 3: ...ään ohjeidemme mukaisesti 14 za předpokladu že jsou využívány v souladu s našimi pokyny odpovídají následujícím normám nebo normativním dokumentům 15 u skladu sa slijedećim standardom ima ili drugim normativnim dokumentom ima uz uvjet da se oni koriste u skladu s našim uputama 16 megfelelnek az alábbi szabvány ok nak vagy egyéb irányadó dokumentum ok nak ha azokat előírás szerint használják 17 spe...

Страница 4: ...štelę 23 Maksimālais pieļaujamais spiediens PS K bar Minimālā maksimālā pieļaujamā temperatūra TS TSmin Minimālā temperatūra zemā spiediena pusē L C TSmax Piesātinātā temperatūra saskaņā ar maksimālo pieļaujamo spiedienu PS M C Dzesinātājs N Spiediena drošības ierīces iestatīšana P bar Izgatavošanas numurs un izgatavošanas gads skat modeļa izgatavotājuzņēmuma plāksnītie 24 Maximálny povolený tlak ...

Страница 5: ...nging from 25 0 to 50 0 kW For changing the refrigerant flow to indoor units the REYQ P system can be combined with BS units of the types BSVQ100P BSVQ160P and BSVQ250P only Other BS unit types will cause malfunctions when combined with the REYQ P system The REYQ P units can be combined with Daikin VRV indoor units for air conditioning purposes suitable for R410A The present installation manual de...

Страница 6: ...ineering Data Book Outdoor unit Total capacity of indoor units REYQ8 100 260 REYQ10 125 325 REYQ12 150 390 REYQ14 175 455 REYQ16 200 520 NOTE If the total capacity of the connected indoor units exceeds the capacity of the outdoor unit cooling and heating performance may drop when running the indoor units Refer to the section on performance characteristics in the Engineering Data Book for details I...

Страница 7: ...ant concentration from exceeding allowable safety limits in the event of a refrigerant leak 11 To prevent dripping water to form a puddle underneath the unit install a drain pan available as option kit Make sure to provide for adequate measures in order to prevent that the outdoor unit be used as a shelter by small animals Small animals making contact with electrical parts can cause malfunctions s...

Страница 8: ...l foundation dimension 7 Distance between foundation bolt holes X Not allowed O Allowed units mm Prepare a water drainage channel around the foundation to drain waste water from around the unit If the unit is to be installed on a roof check the strength of the roof and its drainage facilities first If the unit is to be installed on a frame install the waterproofing board within a distance of 150 m...

Страница 9: ...e pipe size nearest to the required size use the suitable adapters for the change over from inch to mm pipes field supply 6 3 Pipe connection Be sure to perform a nitrogen blow when brazing and to read the paragraph Caution to be taken when brazing refrigerant piping on page 4 first 6 4 Connecting the refrigerant piping 1 Front connection or side connection Installation of refrigerant piping is po...

Страница 10: ... the system Great caution is needed when passing copper tubes through walls Block all gaps in the holes for passing out piping and wiring using sealing material field supply The capacity of the unit will drop and small animals may enter the machine Example passing piping out through the front Any gas remaining inside the stop valve may blow off the pinched piping causing damage or injury 1 Pinched...

Страница 11: ... outdoor unit side choose from the following table in accordance with the capacity of the outdoor unit example refnet joint A How to select the refnet header Choose from the following table in accordance with the total capacity of all the indoor units connected below the refnet header Note 250 type indoor unit can not be connected lower than the refnet header Outdoor unit capacity type Hp Refriger...

Страница 12: ... branch kit to indoor units is 40 m or less however it can be extended up to 90 m if all the following conditions are fulfilled Required conditions Example drawings It is necessary to increase the pipe size of the liquid and suction gas pipe if the pipe length between the first and the final branch kit is over 40 m reducers must be procured on site Increasing the HP LP gas pipe size is not allowed...

Страница 13: ... Valve B 13 Valve C 14 Outdoor unit 15 To BS unit or indoor unit 16 Stop valve 17 Service port 18 Field piping 19 Gas flow NOTE Make sure to perform leak test and vacuum drying using the service ports of the stop valves of the high pressure low pressure gas pipe suction gas pipe and liquid pipe For the service port location refer to the Caution label attached on the front panel of the outdoor unit...

Страница 14: ...s 2 liquid 2 H E liquid 2 R10 Resistor current sensor R31T R32T Thermistor discharge M1C M2C R50 R59 Resistor R90 Resistor current sensor R95 Resistor current limiting S1NPH Pressure sensor high S1NPL Pressure sensor low S1PH S3PH Pressure switch high SD1 Safety devices input T1A Current sensor V1R Diode bridge V1R V2R Power module X1A X9A Connector X1M Terminal strip power supply X1M Terminal str...

Страница 15: ...d interfering with other devices The outer casing of the product may take on an electrical charge due to leaked electrical current which will have to be discharged with the grounding Be sure to install an earth leakage breaker One that can handle high frequency electrical noise This unit uses an inverter which means that an earth leakage breaker capable of handling high frequency electrical noise ...

Страница 16: ... of the transmission wiring terminals 1 Electric wiring diagram Printed on the back of the electric component box lid 2 Power wiring and ground wiring inside conduit When the wiring is routed out through the lateral panel 3 Transmission wiring 4 Pipe opening 5 Conduit 6 Power wiring and ground wiring 7 Cut off the shaded zones before use 8 Through hole cover 9 Electric component box 1 10 Electric ...

Страница 17: ...Liquid pipe 2 High pressure low pressure gas pipe 3 Finishing tape 4 Suction gas pipe 5 Transmission wiring 6 Insulation material 1 Power supply 380 415 V 3 N 50 Hz 2 Earth leakage breaker 3 Fuse 4 Grounding wire 5 Power supply terminal block 6 Connect each power wire RED to L1 WHT to L2 BLK to L3 and BLU to N 7 Ground wire GRN YLW 8 Clamp the power wire to the plastic bracket using a field suppli...

Страница 18: ... 6 Refrigerant piping on page 4 The electrical work 1 Make sure there is no faulty power wiring or loose nuts See 8 Field wiring on page 9 2 Make sure there is no faulty transmission wiring or loose nuts See 8 Field wiring on page 9 3 Make sure the insulation resistance of the main power circuit is not deteriorated Measure the insulation resistance and check if the value is in accordance with rele...

Страница 19: ...ot be charged until all field wiring and field piping has been completed Refrigerant may only be charged after performing the leak test and the vacuum drying Charge the liquid refrigerant with the cylinder in upright position Charge the liquid refrigerant with the cylinder in up side down position Charging with an unsuitable substance may cause explosions and accidents so always make sure that the...

Страница 20: ...stem charging over the permissible quantity can cause liquid hammer Always use protective gloves and protect your eyes when charging refrigerant When the refrigerant charging procedure is done or when pausing close the valve of the refrigerant tank immediately The refrigerant charge port has a electric expansion valve and will be closed at the end of the refrigerant charging However the valve will...

Страница 21: ... indoor temperature The unit will automatically select the cooling mode or heating mode for charging Outdoor temperature 0 C DB 43 C DB Indoor temperature 10 C DB 32 C DB Total indoor unit capacity 80 1 Measuring instrument 2 Refrigerant tank R410A siphon system 3 Charge hose 4 Refrigerant charge port 5 High pressure low pressure gas pipe stop valve 6 Suction gas pipe stop valve 7 Liquid pipe stop...

Страница 22: ... and may cause overcharging 7 Ready Press the button once within 5 minutes If the button is not pushed within 5 minutes P2 will be displayed on the remote controller Refer to 3 Remote controller malfunction code display on page 19 8 Operation When the following LED display is shown open valve A and close the front panel If the front panel is left open the system can not operate properly during the...

Страница 23: ...se valve A and remove the refrigerant tank immediately after finishing the refrigerant charge operation The refrigerant charge port of these units have electric expansion valves that will close automatically when refrigerant charging operation has finished However the electric expansion valves will be opened when other operations start after finishing refrigerant charging operation If the refriger...

Страница 24: ... x w w 20 95 x 100 w x w x w x x 21 100 x w x w x w x w NOTE If you get confused in the middle of the input process press the button to return to setting mode 1 initial state The H1P LED is off x Resume the input procedure from step 2 onwards Make sure to open the stop valves after charging the refrigerant Operating with the stop valves closed will damage the compressor BS2 SET BS3 RETURN BS3 RETU...

Страница 25: ...ttons LED state Throughout the manual the state of the LEDs is indicated as follows Setting the push button switch BS1 5 Function of the push button switch which is located on the outdoor unit PCB A1P The figure shows state of the LED indications when the unit is shipped from the factory Check operation procedure 1 Turn the power on for the outdoor unit and the indoor unit Be sure to turn the powe...

Страница 26: ...normal w abnormal c under preparation or under test operation 2 Indication of low noise operation state x standard operation factory setting w operation 3 Indication of power consumption limitation setting x standard operation factory setting w operation NOTE If you get confused in the middle of the setting process push the button Then it returns to setting mode 1 H1P LED is off Possible functions...

Страница 27: ... seconds The H1P LED is on w Perform following steps 1 Press the button 3 times 2 Press the button once to confirm 3 Press the button in order to change the LED display to the following display 4 Press the button once to confirm 5 Press the button a second time to start the test operation The unit will start the test operation The test operation is automatically carried out in cooling mode the H2P...

Страница 28: ...piping length and correct the refrigerant charge level by recovering any excessive refrigerant with a refrigerant recovery machine Insufficient refrigerant E4 F3 Check if the additional refrigerant charge has been finished correctly Recalculate the required amount of refrigerant from the piping length and add an adequate amount of refrigerant The added amount of refrigerant was not inputted after ...

Страница 29: ...d pipe stop valve service port with the unit not operating refer to Pre charging on page 17 make sure to charge the remaining charging quantity using the following procedure 1 Turn the power of the indoor unit the BS unit and the outdoor unit on 2 Make sure to open the stop valves of the suction gas pipe the high pressure low pressure gas pipe and the liquid pipe completely 3 Connect the refrigera...

Страница 30: ... as the following calculate the volume of A B as a single room or as the smallest room 3 Calculating the refrigerant density using the results of the calculations in steps 1 and 2 above If the result of the above calculation exceeds the maximum concentration level then make similar calculations for the second then third smallest room and so until the result falls short of the maximum concentration...

Страница 31: ...IN D UNIT TO OUT D UNIT TO IN D UNIT TO OUT D UNIT F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 F1 F2 8 7 7 6 6 3 5 6 13 12 1 1 2 3 4 5 3 4 7 8 2 9 6 4 1 2 5 7 7 8 1 9 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 18 10 9 1 2 4 3 5 7 8 19 6 16 17 14 10 15 7 6 2 1 9 8 12 4 5 3 13 14 11 16 17 13 12 11 15 1 2 1 2 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 2 3 4 9 10 1 5 6 7 8 14 15 16 17 19 20 21 24 25 18 22 23 ...

Страница 32: ...4PW39996 1B Copyright Daikin ...