Unit Maintenance
www.DaikinApplied.com 133
IM 1287-4 • REBEL APPLIED ROOFTOP
Condensate Management
NOTICE
Furnace condensate is acidic and may discolor roofing materials. It is the
responsibility of the end user or contractor to determine if the condensate
will damage roofing material. If applicable codes or regulations require, the
condensate must be or routed to a field supplied and installed drain system.
CAUTION
Condensate may freeze if it is not properly piped to a drain or provided with
some form of heat protection. Frozen drain lines may cause accumulation
of condensate inside the heat exchanger which may result in damage to the
rooftop equipment and the facility.
All units are equipped with a 3/4" NPT stainless steel
condensate drain pipe projecting from the vestibule side of
the furnace section, below the fuel gas inlet. Note that the
condensate drain pipe nipple is the lower of the two pipe
nipples, reference
. Drainage of condensate directly
onto the roof may be acceptable in some jurisdictions; it is the
responsibility of the end user or contractor to determine if the
condensate will damage roofing material. If applicable codes
or regulations require, condensate must be routed to a field
supplied and installed drain system.
Figure 173: Condensate Drain Field Connection Detail
Operations
WARNING
Overheating or failure of the gas supply to shut off can cause equipment
damage, severe personal injury, or death. Turn off the manual gas valve to
the appliance before shutting off the electrical supply.
WARNING
Testing for gas leaks with an open flame can cause an explosion or fire
resulting in property damage, personal injury, or death. Use a commercially
available soap solution made specifically for the detection of leaks to check
all connections.
CAUTION
Hot surface hazard. If the furnace has been operating prior to service, allow
chimney flue, gas heat exchanger, and combustion manifold to cool before
servicing. Failure to allow hot surfaces to cool may result in personal injury..
Start-Up Responsibility
The start-up organization is responsible for determining that
the furnace, as installed and applied, will operate within the
limits specified on the furnace rating plate.
1.
The furnace must not operate at insufficient airflow or
temperature rise greater than specified (refer to
). On variable air volume
systems it must be determined that the furnace will not
be operated if or when system airflow is reduced below
the specified minimum airflow.
2. It must be established that the gas supply is within the
proper pressure range (refer to
and
Start-up and service of this equipment must be
performed by trained and qualified technicians.
It is highly
recommended that the initial start-up and future service be
performed by Daikin trained technicians who are familiar with
working on live equipment. A representative of the owner or the
operator of the equipment should be present during start-up to
receive instructions in the operation, care, and adjustment of
the unit.
Содержание Rebel Applied DPSA
Страница 15: ...Introduction www DaikinApplied com 15 IM 1287 4 REBEL APPLIED ROOFTOP Figure 17 VFD Inverter Box Components ...
Страница 109: ...Unit Maintenance www DaikinApplied com 109 IM 1287 4 REBEL APPLIED ROOFTOP Figure 159 10kW 50kW Full SCR Control ...
Страница 144: ...IM 1287 4 REBEL APPLIED ROOFTOP 144 www DaikinApplied com Furnace Wiring Diagrams Figure 178 600 MBH 2 Stage ...
Страница 145: ...Furnace Wiring Diagrams www DaikinApplied com 145 IM 1287 4 REBEL APPLIED ROOFTOP Figure 179 600 MBH 4 Stage ...
Страница 147: ...Figure 181 600 MBH 5 1 Modulation 400 MBH and 600 MBH 10 1 Modulation ...
Страница 160: ......
Страница 161: ......