M
eChanICal
I
nsTallaTIon
www.DaikinApplied.com 39
IM 893-10 • ROOFPAK SINGLEZONE UNITS
Cabinet Weather Protection
CAUTION
Transportation, rigging, or maintenance can damage the
unit’s weather seal. Periodically inspect the unit for leakage.
Standing moisture can promote microbial growth, disease, or
damage to the equipment and building.
This unit ships from the factory with fully gasketed access
doors and cabinet caulking to provide weather resistant
operation. After the unit is set in place, inspect all door gaskets
for shipping damage and replace if necessary.
Protect the unit from overhead runoff from overhangs or other
such structures.
Re-caulk field assembled options such as external piping or
vestibules per the installation instructions provided with the
option.
Installing Ductwork
WARNING
Mold can cause personal injury. Materials such as gypsum
wallboard can promote mold growth when damp. Such
materials must be protected from moisture that can enter
units during maintenance or normal operation.
NOTICE
Installer must provide access in the ductwork for plenum-
mounted controls. Once duct work is installed in units with
side discharge, access to plenum-mounted components is
difficult.
On bottom-supply/bottom-return units, if a Daikin roof curb
is not used, installing contractor should make an airtight
connection by attaching field fabricated duct collars to the
bottom surface of either the roof curb’s duct flange or the unit’s
duct opening. Do not support the total weight of the duct work
from the unit or these duct flanges. See
Units with optional back return, side discharge, or end
discharge (on RFS units) all have duct collars provided.
To expose the discharge duct collars on a side discharge
unit, remove the plenum section access door and the door
gasketing.
Use flexible connections between the unit and ductwork to
avoid transmission of vibration from the unit to the structure.
To minimize losses and sound transmission, design duct work
per ASHRAE and SMACNA recommendations.
Where return air ducts are not required, connect a sound
absorbing T or L section to the unit return to reduce noise
transmission to the occupied space.
Ductwork exposed to outdoor conditions must be built in
accordance with ASHRAE and SMACNA recommendations
and local building codes.
Figure 44: Installing Duct Work
Unit duct opening
Unit base
9.76"
4.58"
Roof curb
Duct flanger
in roof curb
Flexible
connector
Ductwork
Содержание RDT
Страница 60: ...IM 893 10 ROOFPAK SINGLEZONE UNITS 60 www DaikinApplied com Wiring Diagrams Figure 64 VFD Control SAF and RAF...
Страница 61: ...Wiring Diagrams www DaikinApplied com 61 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 65 VAV Control Inputs...
Страница 65: ...Wiring Diagrams www DaikinApplied com 65 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 67 Electric Heat Control...