1. Set curbing parts A through K per dimensions shown
over roof opening or on a level surface. Note location of
return and supply air openings.
2. If applicable, set other curbing parts (D, L, M, etc.) in
place making sure that the orientation complies with the
assembly instructions. Check alignment of all mating bolt
holes. See Detail A.
3. Bolt curbing parts together using fasteners provided.
Tighten all bolts finger tight.
4. Square entire curbing assembly and securely tighten all
bolts.
5. Position curb assembly over roof openings. Curb must
be level from side to side and over its length. Check that
top surface of the curb is flat with no bowing or sagging.
6. Weld curbing in place. Caulk all seams watertight.
Remove backing from 0.25ʺ (6 mm) thick × 1.50ʺ (38
mm) wide gasketing and apply to surfaces shown by
cross-hatching.
7. Flash curbing into roof as shown in Detail B.
8. Parts E and F are not required on units with no return
shaft within the curb perimeter.
9. Parts G and H are not required on units with no supply
shaft within the curb perimeter.
10. Be sure that electrical connections are coordinated (see
Figure 24: RPS/RFS Roof Curb Assembly
Содержание RDT
Страница 60: ...IM 893 10 ROOFPAK SINGLEZONE UNITS 60 www DaikinApplied com Wiring Diagrams Figure 64 VFD Control SAF and RAF...
Страница 61: ...Wiring Diagrams www DaikinApplied com 61 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 65 VAV Control Inputs...
Страница 65: ...Wiring Diagrams www DaikinApplied com 65 IM 893 10 ROOFPAK SINGLEZONE UNITS Figure 67 Electric Heat Control...