
5
|
Before operation
User reference guide
17
FTXM20~4 FTXM20~71R2V1B
Daikin room air conditioner
4P518786-5F – 2020.06
5 Before operation
5.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Setting the brightness of the indoor unit display.
▪
Setting the clock.
▪
Turning on the power supply.
5.2 To insert the batteries
The batteries will last for about 1 year.
1
Remove the front cover.
2
Insert both batteries at once.
3
Put back the front cover.
2
3
1
AAA.LR03
INFORMATION
▪
Low energy of battery is indicated by flashing of LCD display.
▪
ALWAYS replace both batteries at once.