background image

 

O-UC12-FEB23-3 

Page 2 

Wiring Diagram  

LFSLHS0200AXV1 

 

 

LFSLHS0300AXV1 

 

 

 

Содержание O-UC12-FEB23-3

Страница 1: ...3 Low Temperature Scan below QR code to download latest manual from Website https drm daikinmalaysia com download AIR COOLED COMMERCIAL REFRIGERATION SLIM UNIT COOLER INSTALLATION MAINTENANCE IOM NO O...

Страница 2: ...task in question SAFETY SYMBOLS The following symbols are used in this document to alert the reader to specific situations WARNING Warning Risk of serious injury or death to person CAUTION Caution Da...

Страница 3: ...Wave with fins spacing 5mm copper bare tubes with nominal diameter of 10mm This fins pattern stands out for better performance of air flow and heat transfer Superheat measurement air tightness test a...

Страница 4: ...mm 12 7 12 7 Nominal capacities are rated in accordance with EN 328 SC3 wet coil condition for R404A with TD 7K Sound Pressure Level is measured at 1m away from every side of the unit and 1m below fa...

Страница 5: ...0 95 1 1 LFSLHS0300AXV1 1 1 1 0 95 1 1 TD Correction Factor To calculate cooling capacity for different temperature difference multiply the cooling capacity obtained from section 2 2 2 with respectiv...

Страница 6: ...e identified and operatives have suitable PPE Ensure the working area has adequate ventilation during brazing procedures The units contain moving machinery and electrical power hazards which may cause...

Страница 7: ...ting and ensure only superheated vapor is returned to compressor suction Adequately support all pipe work at a maximum of 2 meter intervals Pressure testing The unit cooler has been pressure tested in...

Страница 8: ...the drain fitting MUST be fitted the right way around otherwise it will not tighten against the drip tray One side of the nut has an angled recess this must be facing towards the drip tray The fittin...

Страница 9: ...with longer length as shown in below diagram Cable type and sizing must be selected for the application and the electrical installation should conform to the current local standards The power cable to...

Страница 10: ...y in room Limit access to cold room do not keep doors open during stocking Accumulation of ice or water in drain pan Drain line plugged Clean drain line Make sure drain line is insulated properly Drai...

Страница 11: ...O UC12 FEB23 3 Page 2 Wiring Diagram LFSLHS0200AXV1 LFSLHS0300AXV1...

Страница 12: ...ON MALAYSIA SDN BHD 34543 W Shah Alam Plant 11A Jalan Utas 15 7 Seksyen 15 40200 Shah Alam Selangor Malaysia Banting Plant Lot 10 Jalan Perusahaan 8 Kawasan Perusahaan Pekan Banting 42700 Banting Sela...

Отзывы: