Installer Responsibilities
The installation of this equipment shall be in accordance
with the regulations of authorities having jurisdiction and all
applicable codes. It is the responsibility of the installer to
determine and follow the applicable codes.
CAUTION
Sharp edges on sheet metal and fasteners can cause
personal injury. This equipment must be installed, operated,
and serviced only by an experienced installation company and
fully trained personnel.
Receiving Inspection
When the equipment is received, all items should be carefully
checked against the bill of lading to be sure all crates and
cartons have been received.
If the unit has become dirty
during shipment (winter road chemicals are of particular
concern), clean it when received .
All units should be carefully inspected for damage when
received. Report all shipping damage to the carrier and file a
claim. In most cases, equipment is shipped F.O.B. factory and
claims for freight damage should be filed by the consignee.
Before unloading the unit, check the unit nameplate to make
sure the voltage complies with the power supply available.
Service Clearance
Allow service clearances as approximately indicated in
. Also, Daikin recommends providing a roof walkway to the
rooftop unit as well as along each side of the unit that provides
access to most controls and serviceable components.
Figure 1: Service Clearances
Evaporator/
Hot Gas Reheat Coil
Optional
Energy Recovery Wheel
Exhaust Air Fan Assembly
Optional
Energy Recovery Wheel (ERW)
Assembly
Fan
Assembly
(removal from
this side only)
Optional Gas Furnace
or Electric Heat
15-50 Ton
Optional Hot
Water Heat
(removal from
this side only*)
15-50 Ton
61-75 Ton
A
= 72 (1828 mm) 60 (1524 mm)
B
= 60 (1524 mm) 72 (1828 mm)
* 61-75 Ton
Fan and Gas/Electric/Hot Water
Heaters can be removed from
either side
B
A
60.00
(1524 mm)
60.00
(1524 mm)
96.00
(2438 mm)
IM 1058-8 • MAVERICK II ROOFTOP SYSTEMS
4
www.DaikinApplied.com
m
eChanICal
I
nsTallaTIon
Содержание MPS015 F
Страница 70: ...Figure 64 VAV Control Inputs IM 1058 8 MAVERICK II ROOFTOP SYSTEMS 70 www DaikinApplied com Wiring Diagrams ...
Страница 80: ...Figure 70 CAV Power IM 1058 8 MAVERICK II ROOFTOP SYSTEMS 80 www DaikinApplied com Wiring Diagrams ...
Страница 81: ...Figure 70 continued CAV Power Wiring Diagrams www DaikinApplied com 81 IM 1058 8 MAVERICK II ROOFTOP SYSTEMS ...
Страница 82: ...Figure 71 CAV Control Inputs IM 1058 8 MAVERICK II ROOFTOP SYSTEMS 82 www DaikinApplied com Wiring Diagrams ...
Страница 86: ...Figure 76 Energy Recovery IM 1058 8 MAVERICK II ROOFTOP SYSTEMS 86 www DaikinApplied com Wiring Diagrams ...