5 Installation
Installation and operation manual
18
4BY1
Air-cooled refrigeration condensing unit
4P495373-1 – 2017.07
NOTICE
The operation output P1/P2 of the outdoor unit must be
connected to all solenoid valves that are installed upstream
of the expansion valves at the indoor unit. This connection
is required because the outdoor unit must be able to
control the solenoid valves during startup (to prevent liquid
refrigerant from entering the compressor) and oil return
operation.
NOTICE
Remote operation switch
. The unit is factory-equipped
with an operation switch with which you can turn unit
operation ON/OFF. If you want to remotely turn outdoor
unit operation ON/OFF, a remote operation switch is
required. Use a voltage-free contact for microcurrent
(≤1 mA, 12 V DC). Connect to X2M/C+D, and set to
"Remote ".
NOTICE
Low-noise switch
. If you want to remotely turn ON/OFF
low-noise operation (see setting [2‑18]), you must install a
low-noise switch. Use a voltage-free contact for
microcurrent (≤1 mA, 12 V DC). Connect to X2M/A+B.
NOTICE
Output signals
. The outdoor unit is provided with a
terminal (X3M) that can output 4 different signals. The
signal is 220~240 V AC. The maximum load for all signals
is 0.5 A. The unit outputs a signal in the following
situations:
▪ C/C1:
caution
signal – connection recommended –
when an error occurs that does not stop unit operation.
▪ C/W1:
warning
signal – connection recommended –
when an error occurs that causes unit operation to
stop.
▪ R/P2:
run
signal – connection optional – when the
compressor is running.
▪ P1/P2:
operation
signal – connection mandatory –
when the indoor unit solenoid valve is being controlled.
5.6.2
Guidelines when knocking out knockout
holes
NOTICE
Precautions when making knockout holes:
▪ Avoid damaging the casing.
▪ After making the knockout holes, we recommend you
remove the burrs and paint the edges and areas
around the edges using repair paint to prevent rusting.
▪ When passing electrical wiring through the knockout
holes, wrap the wiring with protective tape to prevent
damage.
b
c
a
a
Knockout hole
b
Burr
c
Sealant etc.
5.6.3
Guidelines when connecting the electrical
wiring
Tightening torques
Wiring
Screw size
Tightening
torque (N•m)
X1M: power supply wiring
(power shielded
ground)
M5
2.2~2.7
X2M: remote operation
switch, low-noise switch
and transmission output
M3.5
0.8~0.97
X3M: output signals
M4
2.39~2.91
5.6.4
To connect the electrical wiring on the
outdoor unit
NOTICE
▪ Follow the wiring diagram (delivered with the unit,
located at the inside of the service cover).
▪ Make sure the electrical wiring does NOT obstruct
proper reattachment of the service cover.
1
Remove the service cover.
2
Connect the
remote
operation switch
as follows:
B
A
C
F1 F2
X2M
D
NOTICE
Remote operation switch
. The unit is factory-equipped
with an operation switch with which you can turn unit
operation ON/OFF. If you want to remotely turn outdoor
unit operation ON/OFF, a remote operation switch is
required. Use a voltage-free contact for microcurrent
(≤1 mA, 12 V DC). Connect to X2M/C+D, and set to
"Remote ".
3
Connect the
low-noise switch
as follows:
B
A
C
F1 F2
X2M
D
NOTICE
Low-noise switch
. If you want to remotely turn ON/OFF
low-noise operation (see setting [2‑18]), you must install a
low-noise switch. Use a voltage-free contact for
microcurrent (≤1 mA, 12 V DC). Connect to X2M/A+B.
4
If you want to connect the
modbus communication box
,
connect the transmission wiring as follows:
B
A
C
F1 F2
X2M
D
5
Connect the wiring to the
output signals
terminal (X3M) as
follows:
Содержание LRMEQ3BY1
Страница 31: ......
Страница 32: ...4P495373 1 2017 07 Copyright 2016 Daikin 4P495373 1 0000000T...