Installation & Commissioning
9.1
Unit site location
•
In order to achieve maximum cooling capacity, the installation location for the condensing unit should be
carefully selected.
•
Install the condensing unit in such a way so that hot air ejected by the condensing unit cannot be drawn in
again (short circuit of hot discharge air). Allow sufficient space for maintenance around the unit.
•
Ensure that there is no obstruction to air flow into or out of the unit. Remove obstacles which block air intake
or discharge.
•
The location must be well ventilated, so the unit can draw in and distribute plenty of air thus lowering the
condensing temperature.
•
To optimize the unit running conditions, the condenser coil must be cleaned at regular intervals.
•
The unit must be level in all directions.
✓
✓
X
X
Содержание JEHBSCU0200M1
Страница 8: ...T CU01 MAR21 3 8 Series 4 LT EVI JEHSCU0951CL3 EVI LRLVFS0951...
Страница 19: ...T CU01 MAR21 3 19 JEHSCU0951CL3 LRLVFS0951BXY1...
Страница 35: ...T CU01 MAR21 3 35 13 Exploded View Series 2...
Страница 36: ...T CU01 MAR21 3 36 Series 3...
Страница 37: ...T CU01 MAR21 3 37 Series 4 MT...
Страница 38: ...T CU01 MAR21 3 38 Series 4 LT...
Страница 39: ...T CU01 MAR21 3 39 Series 4 LT EVI...