
ESIE15-13B
Field Setting
57
Part 4
Field Setting
1.1 Pre-run Checks ......................................................................................58
1.2 Remote Controller Confirmation.............................................................58
1.3 Test Run.................................................................................................59
1.4 Precautions Regarding Test Run ...........................................................59
1.5 Failure Diagnosis at the Moment of First Installation .............................60
2. Field Setting from Remote Controller....................................................61
2.1 Wired Remote Controller........................................................................61
2.2 Wireless Remote Controller ...................................................................66
2.3 Settings Contents and Code No. for Indoor Units ..................................67
2.4 Overview of the Field Setting on the Outdoor Units ...............................73
2.5 Quiet (Low Noise) Operation..................................................................74
2.6 I-Demand Function.................................................................................76
2.7 Setting for Low Humidity Application......................................................77
2.8 Defrost Start Setting ...............................................................................80
2.9 Slow start................................................................................................80
3. Field Setting from Outdoor Unit PCB ....................................................81
3.1 Location of DIP Switch and BS Button ...................................................81
3.2 Field Setting for Outdoor Unit.................................................................82
4. Emergency Operation ...........................................................................92
Содержание GQI-Eco Series
Страница 2: ......
Страница 6: ...ESIE15 13B iv Table of Contents...
Страница 14: ...Introduction ESIE15 13B xii...
Страница 18: ...Outlook Outdoor Units ESIE15 13B 4 General Information 2 Outlook Outdoor Units...
Страница 22: ...Operating range ESIE15 13B 8 General Information...
Страница 108: ...Emergency Operation ESIE15 13B 94 Field Setting...