![Daikin FXNQ20MAVE Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/daikin/fxnq20mave/fxnq20mave_technical-data-manual_4704420018.webp)
• VRV Systems • Indoor Units
17
• Indoor Units • Concealed Floor Standing Unit • FXNQ-MAVE
10
Installation
10 - 1 Suspension bolt pitch position
3
10
FXNQ-MA
3PN86154-1-5
���
���
���
���
���
���
���
Model
A
FXNQ20,25MA
590
FXNQ32,40MA
730
FXNQ50,63MA
1,010
1
Open the lid of control panel (both left and right).
2
Remove screws (both left and right).
3
Push the knobs (both left and right) to the rear.
4
Lift the front of the top plate.
5
Lower the front panel towards the front of the unit.
6
To close, perform the procedure in opposite order.
Pull towards the front until the knob snaps in place.
•
Positioning of holes for fastening to the wall
•
How to open/close the front panel