background image

11 Before operation

Installation and operation manual

13

FXFQ20~125BVEB
VRV system air conditioner
4P540926-1B – 2019.01

11

Before operation

WARNING

This unit contains electrical and hot parts.

WARNING

Before operating the unit, be sure the installation has been
carried out correctly by an installer.

CAUTION

It is not good for your health to expose your body to the air
flow for a long time.

CAUTION

To  avoid  oxygen  deficiency,  ventilate  the  room  sufficiently
if equipment with burner is used together with the system.

CAUTION

Do  NOT  operate  the  system  when  using  a  room
fumigation-type  insecticide.  Chemicals  could  collect  in  the
unit,  and  endanger  the  health  of  people  who  are
hypersensitive to chemicals.

NOTICE

Be  sure  to  turn  on  the  power  6  hours  before  operation  in
order  to  have  power  running  to  the  crankcase  heater  and
to protect the compressor.

This  operation  manual  is  for  the  following  systems  with  standard
control.  Before  initiating  operation,  contact  your  dealer  for  the
operation  that  corresponds  to  your  system  type  and  mark.  If  your
installation has a customised control system, ask your dealer for the
operation that corresponds to your system.

Operation modes:

▪ Heating and cooling (air to air).

▪ Fan only operation (air to air).

12

Operation

12.1

Operating the system

12.1.1

About operating the system

▪ To protect the unit, turn on the main power switch 6 hours before

operation.

▪ If the main power supply is turned off during operation, operation

will restart automatically after the power turns back on again.

12.1.2

About cooling, heating, fan only, and
automatic operation

▪ The  air  flow  rate  may  adjust  itself  depending  on  the  room

temperature  or  the  fan  may  stop  immediately.  This  is  not  a
malfunction.

12.1.3

About the heating operation

It  may  take  longer  to  reach  the  set  temperature  for  general  heating
operation than for cooling operation.

The following operation is performed in order to prevent the heating
capacity from dropping or cold air from blowing.

Defrost operation

In  heating  operation,  freezing  of  the  outdoor  unit's  air  cooled  coil
increases  over  time,  restricting  the  energy  transfer  to  the  outdoor
unit's coil. Heating capability decreases and the system needs to go
into  defrost  operation  to  be  able  to  remove  frost  from  the  outdoor
unit’s  coil.  During  defrost  operation  the  heating  capacity  on  the
indoor  unit  side  will  temporarily  drop  until  defrosting  is  completed.
After defrosting, the unit will regain its full heating capacity.

The  indoor  unit  will  stop  fan  operation,  the  refrigerant  cycle  will
reverse  and  energy  from  inside  the  building  will  be  used  to  defrost
the outdoor unit coil.

The indoor unit will indicate defrost operation on the display 

.

Hot start

In order to prevent cold air from blowing out of an indoor unit at the
start  of  heating  operation,  the  indoor  fan  is  automatically  stopped.
The  display  of  the  user  interface  shows 

.  It  may  take  some

time before the fan starts. This is not a malfunction.

12.1.4

To operate the system

1

Press the operation mode selector button on the user interface
several times and select the operation mode of your choice.

Cooling operation

Heating operation

Fan only operation

2

Press the ON/OFF button on the user interface.

Result: 

The  operation  lamp  lights  up  and  the  system  starts

operating.

12.2

Using the dry program

12.2.1

About the dry program

▪ The  function  of  this  program  is  to  decrease  the  humidity  in  your

room with minimal temperature decrease (minimal room cooling).

▪ The  micro  computer  automatically  determines  temperature  and

fan speed (cannot be set by the user interface).

▪ The system does not go into operation if the room temperature is

low (<20°C).

12.2.2

To use the dry program

To start

1

Press the operation mode selector button on the user interface
several times and select 

 (program dry operation).

2

Press the ON/OFF button of the user interface.

Result: 

The  operation  lamp  lights  up  and  the  system  starts

operating.

To stop

3

Press the ON/OFF button on the user interface once again.

Result: 

The  operation  lamp  goes  out  and  the  system  stops

operating.

NOTICE

Do not turn off power immediately after the unit stops, but
wait for at least 5 minutes.

12.3

Adjusting the air flow direction

Refer to the operation manual of the user interface.

Содержание FXFQ20BVEB

Страница 1: ...d operation manual VRV system air conditioner English Installation and operation manual VRV system air conditioner FXFQ20BVEB FXFQ25BVEB FXFQ32BVEB FXFQ40BVEB FXFQ50BVEB FXFQ63BVEB FXFQ80BVEB FXFQ100B...

Страница 2: ...pogojem da se uporabljajo v skladu z na imi navodili on vastavuses j rgmis t e standardi te ga v i teiste normatiivsete dokumentidega kui neid kasutatakse vastavalt meie juhenditele atitinka emiau nur...

Страница 3: ...n airflow 14 12 4 1 To start the active circulation airflow 14 13 Maintenance and service 14 13 1 Precautions for maintenance and service 14 13 2 Cleaning the air filter suction grille air outlet and...

Страница 4: ...allation with standard decoration panel 256 mm In case of installation with design decoration panel 294 mm In case of installation with self cleaning decoration panel 263 mm In case of installation wi...

Страница 5: ...a1 Nut field supply a2 Double nut field supply b Washer accessories c Hanger bracket attached to the unit Paper pattern for installation upper part of the packing Use the paper pattern to determine t...

Страница 6: ...cessory b Drain hose accessory c Rising drain piping vinyl pipe of 25 mm nominal diameter and 32 mm outer diameter field supply d Hanging bars field supply Condensation Take measures against condensat...

Страница 7: ...exposed to any substance which may corrode components containing refrigerant unless the components are constructed of materials that are inherently resistant to corrosion or are suitably protected aga...

Страница 8: ...Be sure to keep the power line and transmission line apart from each other Transmission wiring and power supply wiring may cross but may NOT run parallel 1 Remove the service cover 2 User interface ca...

Страница 9: ...t the air volume speed If you want Then1 Outdoor unit M C1 C2 During cooling operation LL2 12 22 6 01 Setup volume2 02 During heating operation LL2 12 22 3 01 Setup volume2 02 Setting Time to clean ai...

Страница 10: ...m a test run This task is only applicable when using the BRC1E52 or BRC1E53 user interface When using any other user interface see the installation manual or service manual of the user interface NOTIC...

Страница 11: ...here is a voltage imbalance There is a missing phase in case of three phase power supply units Note Operation will be impossible Turn OFF the power recheck the wiring and switch two of the three elect...

Страница 12: ...ermostat S RH Humidity sensor S W SW Operation switch SA F1S Surge arrestor SR WLU Signal receiver SS Selector switch SHEET METAL Terminal strip fixed plate T R Transformer TC TRC Transmitter V R V Va...

Страница 13: ...eezing of the outdoor unit s air cooled coil increases over time restricting the energy transfer to the outdoor unit s coil Heating capability decreases and the system needs to go into defrost operati...

Страница 14: ...mation Configuration 3 Select Circulation airflow Return Setting Main Menu 1 2 Circulation Airflow Individual Air Direction Energy Saving Options Schedule Maintenance Information Configuration 4 Choos...

Страница 15: ...quipment How to clean the air filter NOTICE Do NOT use water of 50 C or higher Possible consequence Discoloration and deformation 1 Open the suction grille Standard panel 1 Design panel 1 1 2 2 2 Remo...

Страница 16: ...he atmosphere Refrigerant type R410A Global warming potential GWP value 2087 5 NOTICE Applicable legislation on fluorinated greenhouse gases requires that the refrigerant charge of the unit is indicat...

Страница 17: ...4P540926 1B 2019 01 15 Disposal NOTICE Do NOT try to dismantle the system yourself dismantling of the system treatment of the refrigerant oil and other parts MUST comply with applicable legislation U...

Страница 18: ......

Страница 19: ......

Страница 20: ...4P540926 1B 2019 01 Copyright 2018 Daikin...

Отзывы: