Daikin FWW02-20DA Скачать руководство пользователя страница 4

 

 

 

2

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 

 

 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 

INSTALLATION

 

RECEIVING 

All  units  leaving  the  factory  have  been  inspected  to  ensure  the  shipment  of  high  quality  products  and 
reasonable means are utilized to properly pack the fan coil units to protect them in transit. 

Carefully  inspect  all  shipments  immediately  upon  delivery.  When  damage  is  visible,  note  this  fact  on  the 

carrier’s  freight  bill  and  request  that  the  carrier  send  a  representative  to  inspect  the  damage.  This  may  be 
done by telephone or in person, but should always be confirmed in writing. 

The  shipment  should  be  unpacked  in  the  presence  of  the  agent  so  that  the  damage  or  loss  can  be 

determined. The carrier’s agent will make an inspection report and a copy will be given to the consignee for 
forwarding to the carrier with a formal claim. 

LOCATION 

Before installation, please check the following: 
1.  There  must  be  enough  space  for  unit  installation  and  maintenance.  Please  refer  to  the  outline  and 

dimensions and fig.1 for the minimum distance between the unit and obstacle.

 

2.  In case of installation in free blow, the unit must be installed at a minimum height of 2.5m to avoid contact 

with the appliance.

 

3.  Please ensure enough space for piping connection and electrical wiring. 

4.  Please make sure that the hanging rods can support weight of the unit. 

INSTALLATION 

1.  The unit is designed for concealed ceiling installation. 
2.  There are holes on the top of the unit for hanging. Please refer to Fig.1. Fig.2 and Fig.3. 

3.  Make sure that the top of the unit is level. 

INSULATION 

1.  The insulation design and materials should be complying with local and national codes and regulations. 

2.  Chilled water pipes and all parts on the pipes should be insulated. 

3.  It is also necessary to insulate the air duct. 

 

CEILING

OBSTACLE

B

C

A

OBSTACLE

≥400mm

(H

+

1

5

0

)

m

m

D

DRAIN PIPE

The suggested slope of the 

drain pipe is at least 1:50.

The level of water in the drain 
pan should be less than 15mm.

WATER LEVEL

1

5

m

m

≥200mm

H=the height of FCU

 

 

 
 
 

A

DISCHANGE AIR

RETRUN AIR

CEILING ACCESS PANEL

CEILLING

WITH AIR RETRUN

L

M

N

NOTE:

Dimension M and N was 

determined by air duct design, air 
duct should be fire-proof, refer to 
concerned country national and 
local regulations.
Circulatory air pressure drop should 
be approximately equal to the 

External Static Pressure.

≥300mm

WATER INLET

WATER OUTLET

 

Fig. 2 

WITH AND WITHOUT PLENUM FORM:

 

Fig. 1 

Содержание FWW02-20DA

Страница 1: ...INSTALLATION OPERATION MAINTENANCE MANUAL CEILING CONCEALED FAN COIL UNIT FWW02 20DA ...

Страница 2: ...Contents Safety Precaution 1 Installation 2 Operating Limits 4 Service and Maintenance 5 Trouble Shooting 6 Outlines and Dimensions 7 FWW1707 A1 Part No M08019060037 ...

Страница 3: ...owing important points when installing Ensure that the drainage piping is connected properly If the drainage piping is not connected properly it may cause water leakage which will dampen the furniture Sharp edges and coil surfaces are potential locations which may cause injury hazards Avoid from being in contact with these places Tightening torque should not be too high when connecting water pipes...

Страница 4: ... a minimum height of 2 5m to avoid contact with the appliance 3 Please ensure enough space for piping connection and electrical wiring 4 Please make sure that the hanging rods can support weight of the unit INSTALLATION 1 The unit is designed for concealed ceiling installation 2 There are holes on the top of the unit for hanging Please refer to Fig 1 Fig 2 and Fig 3 3 Make sure that the top of the...

Страница 5: ...h near the water entering and leaving pipe during pipeline connection Fasten the joints slowly at a constant speed The torque is 110 N m 11 2 kgf m at most When tools with long arm of force are used properly set the torque An excessive torque can deform or even damage the copper pipe and cause leakage The pipeline connection is shown in the following figure A B Water outlet Adaptor Note Plane A wh...

Страница 6: ... Fe mg Fe L 1 0 S2 mg S 2 L 0 NH mg NH L 1 0 SiO2 mg SiO2 L 50 Note indicates relevant factors that are inclined to corrosion or scale formation WIRING 1 Wiring connection must be done according to the wiring diagram on the unit 2 A breaker device must be installed at power supply incoming line it should have at least 3mm contact separation 3 The unit must be GROUNDED well 4 An appropriate strain ...

Страница 7: ...ger The motor is maintenance free since it is equipped with self lubricating bearings Cleaning the air filter Cut voltage to the unit by turning the line switch to OFF For cleaning the air filter proceed as follows Access the equipment through the inspection panel and remove the air filter by unscrewing the fixing knobs Wash the filter with lukewarm water or for dry powders with compressed air Rea...

Страница 8: ... position Turn On the unit select On Symptom 2 Poor cooling or heating performance POSSIBLE CAUSES CORRECTIVE ACTION Dirty or clogged air filter Clean the air filter Obstacle near the air inlet or outlet Remove the obstacle Air inside the heat exchanger Contact the installer Doors and windows are open Close doors and windows The unit is running at low speed Select medium or high fan speed Symptom ...

Страница 9: ...06DA 1095 872 907 889 942 960 FWW07DA 1425 1202 1237 1219 1272 1290 FWW08DA 1525 1302 1337 1359 1412 1420 FWW12DA 1425 1202 1237 1239 1289 1307 FWW14DA FWW16DA 382 L FWW10DA M 72 M 1095 872 907 889 942 960 825 592 627 649 702 720 1525 1302 1337 1359 1412 1420 675 452 487 469 522 540 1525 1302 1337 1322 1372 1390 201 194 599 266 297 FWW18DA 413 82 1825 1602 1637 1622 1672 1690 FWW20DA OUTLINES AND ...

Страница 10: ......

Страница 11: ...9 ...

Страница 12: ...10 ...

Отзывы: