4
|
Before operation
User reference guide
16
FTXTM-R, FTXTM-S
Daikin room air conditioner
4P728152-2 – 2023.03
4 Before operation
4.1 Overview: Before operation
This chapter describes what you have to do before operating the unit.
Typical workflow
Before operation usually consist of the following stages:
▪
Inserting the batteries in the user interface.
▪
Fixing the user interface to the wall.
▪
Setting the brightness of the indoor unit display.
▪
Setting the clock.
▪
Turning on the power supply.
4.2 To insert the batteries
The batteries will last for about 1 year.
1
Remove the front cover.
2
Insert both batteries at once.
3
Put back the front cover.
2
3
1
AAA.LR03
INFORMATION
▪
Low energy of battery is indicated by flashing of LCD display.
▪
ALWAYS replace both batteries at once.
Содержание FTXTM30R2V1B
Страница 1: ...User reference guide Daikin room air conditioner FTXTM30R2V1B FTXTM30S2V1B FTXTM40S2V1B...
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ...4P728152 2 2023 03 Copyright 2023 Daikin Verantwortung f r Energie und Umwelt...