12.
INSTALLATION SITE
Regarding places for installation
• Is the air conditioner installed at a well ventilated place where there are no obstacles around?
• Do not use the air conditioner in the following places.
a. Filled with much mineral oil such as cutting oil.
b. Where there is much salt such as a beach area.
c. Where sulphured gas exists such as a hot-spring resort.
d. Where there are considerable voltage fluctuation such as a factory or plant.
e. Vehicles and vessels.
f. Where there is much spray of oil and vapour such as a cookery, etc.
g. Where there are machines generating electromagnetic waves.
h. Filled with acid and /or alkaline steam or vapour.
•
Is a snow protection measure taken?
For details, consult your local dealer about snow protection hoods, etc.
Regarding places for installation
• All wiring must be performed by a qualified personnel.
To do wiring, ask your local dealer. Never do it by yourself.
• Make sure that a separate power supply circuit is provided for air conditioner and that all electrical
work is carried out by qualified personnel according to local laws and regulations.
Pay attention to running noises too.
• Are the following places selected ?
a. A place that can sufficiently withstand the mass of the air conditioner with less running noises and
vibrations.
b. A place where the hot wind discharged from the air outlet of the outdoor unit and the running noises
do not cause a nuisance to neighbours.
• Are you sure that there are no obstades near the air outlet of the outdoor unit?
Such obstacles may result in declined performance and increased running noises.
• If abnormal noises occur in use, stop the operation ofthe air conditioner, consult your local dealer.
Regarding drainage of drain piping
• Is the drain piping carried out properly to ensure complete drainage?
If drain piping is not carried out properly, dirt and debris may be accumulated in the drain piping and
cause water leakage. If it occurs, stop the air conditioner and consult with your local dealer for
assistance.
System relocation
• Consult your Daikin dealer about remodelling and relocation.
13.
OPERATION PROCEDURE
• Operating procedure varies with heat pump type and cooling only type. Contact your local dealer to
confirm your system type.
• To protect the air conditioner, turn on the main power switch 6 hours before operation.
• Do not shut off the power supply during seasonal use of the air conditioner.
This is required in order to activate the air conditioner smoothly.
• If the main power supply is turned off during operation, operation will restart automatically after the
power turns back on again.
Read the operation manual attached to the remote controller.
21