
9
Using the remote controller
Check on an indoor unit if the second code of mode No. 21 is set to
"01" (= factory setting). Change the second code according to the
external static pressure of the duct to be connected as shown in
table 2.
Table 2
Setting air filter sign
Remote controllers are equipped with liquid crystal air filter signs
to display the time to clean the air filter.
Change the Second code No. depending on the amount of dirt
or dust in the room. (Second code No. is factory set to "01" for
air filter contamination-light.)
Air filter contamination
Control by 2 Remote Controllers (Controlling 1 indoor
unit by 2 remote controllers)
When using 2 remote controllers, one must be set to "MAIN" and the
other to "SUB".
Installation of the decoration panel
Refer to the installation manual attached to the decoration panel.
After installing the decoration panel, ensure that there is no space
between the unit body and decoration panel.
Test operation
Refer to the section of
"For the following items, take special care
during construction and check after installation is finished" on page 2
.
After finishing the construction of refrigerant piping, drain piping,
and electric wiring, conduct test operation accordingly to protect
the unit.
1
Open the gas side stop valve.
2
Open the liquid side stop valve.
3
Electrify crank case heater for 6 hours.
4
Set to cooling operation with the remote controller and start
operation by pushing ON/OFF button.
5
Press Inspection/Test Operation button 4 times and operate at
Test Operation mode for 3 minutes.
6
Press Inspection/Test Operation button and operate normally.
7
Confirm function of unit according to the operation manual.
If there is no change after airflow adjustment in the
ventilation paths, be sure to perform setting the
automatic airflow adjustment again.
Contact your dealer if there is no change after
performing airflow adjustment in the ventilation paths,
after performing the test operation of the outdoor unit
or when the air conditioning unit is moved to another
location.
If booster fans, an outdoor air processing unit or HRV
via duct are used, do not use automatic airflow
adjustment control with a remote controller.
If the ventilation paths have been changed, perform
the setting of the airflow automatic adjustment again
as described above from step 3 onwards.
NOTE
The second code No. is set to "01" by default.
Mode
No.
First
code No.
Second
code No.
External static pressure (Pa)
FBQ
35
50
60
71
100
125
140
13 (23)
6
01
30
30
30
30
40
50
50
02
–
–
–
–
–
–
–
03
30
30
30
30
–
–
–
04
40
40
40
40
40
–
–
05
50
50
50
50
50
50
50
06
60
60
60
60
60
60
60
07
70
70
70
70
70
70
70
08
80
80
80
80
80
80
80
09
90
90
90
90
90
90
90
10
100
100
100
100
100
100
100
11
110
110
110
110
110
110
110
12
120
120
120
120
120
120
120
13
130
130
130
130
130
130
130
14
140
140
140
140
140
140
140
15
150
150
150
150
150
150
150
Setting
Display interval
Mode No.
First
code No.
Second
code No.
Light
±2500 hrs
10 (20)
0
01
Heavy
±1250 hrs
10 (20)
0
02
No display
–
10 (20)
3
02
NOTE
If the main power supply is turned off during operation,
operation will restart automatically after the power
turns back on again.
Содержание FBQ50D2VEB
Страница 14: ......
Страница 16: ...4P391818 1B 2015 01 Copyright 2014 Daikin...