
8
Application Information
1) Indoor Installation Clearance
Clearance must be provided for the indoor unit from wall and obstacles as shown in figure below.
e
r
o
m
r
o
m
5
.
0
e
r
o
m
r
o
m
5
.
0
e
r
o
m
r
o
m
5
.
0
0.3m or less
3m or more
1m or more
Floor
Obstacle
Bea
m
The installation place (handling ceiling surface) must be level and the height in the ceiling is 370mm or more.
Unit Installation
Ceiling Opening Size = 890mm
Hanging rod size = 780mm
Ceiling Opening Size = 890mm
Hanging rod size = 710mm
WATER DRAINAGE
PIPING DIRECTION
LED
REFRIGERANT
PIPING DIRECTION
• Measure and mark the position for the hanging rod. Drill the hole for the angle nut on the ceiling and fix the hanging
rod.
•
The installation template is extended according to temperature and humidity. Check on dimensions in use.
•
The dimensions of the installation template are the same as those of the ceiling opening dimensions.
• Before ceiling laminating work is completed, be sure to fit the installation template to the indoor unit.
NOTE
Be sure to discuss the ceiling drilling work with the installers concerned.