9.  CONNECTING THE WATER CIRCUIT 

The  evaporator  and  condenser  are  foreseen  of 

GAS

  male  pipe  thread  for  the  water  inlet  and  outlet  (refer  to  the  outlook 

diagram). Evaporator and condenser water connections are to be made in accordance with the outlook diagram, respecting 
the water in- and outlet. 

If  air,  moisture,  or  dust  gets  in  the  water  circuit,  problems  may  occur.  Therefore,  always  consider  the  following  when 
connecting the water circuit: 

1. 

Use clean pipes only. 

2. 

Hold the pipe end downwards when removing burrs. 

3. 

Cover the pipe end when inserting it through wall so that no dust and dirt enter. 

 

 

WARNING 

 

Use a good thread sealant for the sealing of the connections. The sealing must be able to  

 withstand the pressures and temperatures of the system, it must also be resistant to the used glycol in the water. 
The external surface of the water pipes must be adequately protected against corrosion.

 

 

10. 

WATER CHARGE, FLOW AND QUALITY 

To assure proper operation of the unit a minimum water volume is required in the system and the water flow through the 
evaporator must be within the operation range as specified in the table below. 

Table 4- Water flow operation range 

 
 
 
 
 
 
 
 
 
 

WARNING The water pressure should not exceed the maximum working pressure of 10 bar. 

 

WARNING

 

Provide  adequate  safeguards  in  the  water  circuit  to  make  sure  that  the  water  pressure  will 

never exceed the maximum allowable working pressure.  

11. 

PIPING INSULATION 

 

The complete water circuit, inclusive all piping, must be insulated to prevent condensation and reduction of the cooling 
capacity. 
 

11.1 Antifreeze protection for BPHE and recovery exchangers 

If the heat exchangers are completely empty and cleaned with antifreeze solution, additional methods can be used 
against freezing. 
The following protection methods must be considered when designing the system as a whole: 

1.

 continuous water flow circulation inside piping and exchangers. 

 

2.

 addition of an appropriate amount of glycol inside the water circuit or, as alternative, an additional heat insulation and 

heating of exposed piping (internal and external to the unit); 
 

3.

 if the unit does not work during the winter season, emptying and cleaning of the heat exchanger. 

It is the responsibility of the installer and/or of local maintenance personnel to ensure that described antifreeze methods 
are used. 
Make sure that appropriate antifreeze protection is always maintained. Failing to follow the instructions above could 
result in unit damage. 
 
Damage caused by freezing is excluded from the warranty, therefore 

Daikin Applied Europe S.p.A

. declines all 

responsibility. 

 
 
 
 

 

Minimum water volume (I) 

Minimum water flow 

Maximum water flow 

EWWQ014 

62 

31 l/min 

75 l/min 

EWWQ025 

134 

53 l/min 

123 l/min 

EWWQ033 

155 

76 l/min 

186 l/min 

EWWQ049 

205 

101 l/min 

247 l/min 

EWWQ064 

311 

152 l/min 

373 l/min 

Содержание EWWQ-KC

Страница 1: ...EWWQ014KCW1N EWWQ025KCW1N EWWQ033KCW1N EWWQ049KCW1N EWWQ064KCW1N REV 00 Date 01 2022 Supersedes Installation Operation and Maintenance Manual D EIMHP01501 22_00EN PACKAGED WATER COOLED WATER CHILLERS ...

Страница 2: ...lectric power supply 11 12 4 Interconnection cables 11 13 OPERATOR S REPONSIBILITIES 12 14 MAINTENANCE 13 14 1 Routine maintenance 13 15 SERVICE AND LIMITED WARRANTY 16 16 BEFORE STARTING 18 LIST OF TABLES Table 1 Technical specifications 1 4 Table 2 Electrical specifications 1 4 Table 3 Water quality specifications 9 Table 4 Water flow operation range 10 Table 5 Impedance Z 11 Table 6 R410A Press...

Страница 3: ...short circuit leaks fire or other damage to the equipment Be sure only to use accessories optional equipment and spare parts made by Daikin which are specifically designed for use with the equipment and have them installed by a professional If unsure of installation procedures or use always contact your Daikin dealer for advice and information The English text is the original instruction Other lan...

Страница 4: ...al describes the procedures for unpacking installing and connecting the EWWQ units This appliance is intended to be used by expert or trained users in shops in light industry and on farms or for commercial use by lay persons Sound pressure level is less than 70 dB A Table 1 Technical specifications 1 General EWWQ 014 025 033 Dimensions HxWxD mm 600x600x600 Machine Weight kg 120 170 175 Connections...

Страница 5: ...ikin On Site Standard features Glycol application for chilled water temperature down to 10 C Powered Contact General alarm Voltage free digital contacts general operation Reversing Valve Evaporator Water pump Condenser Water pump Backup heater Changeable remote inputs remote start stop remote cooling heating dual setpoint External Alarm Setpoint reset 1 Refer to the operation manual Wiring diagram...

Страница 6: ...TION RANGE Figure 1 Operating limits on EWWQ014 033 Figure 2 Operating limits EWWQ049 064 ELWT Evaporator leaving water temperature CLWT Condenser leaving water temperature 1 Operation with water 2 Operation with glycol below ELWT 4 C ...

Страница 7: ...danger of fire due to leakage of non flammable gas 4 Select the location of the unit in such a way that the sound generated by the unit does not disturb anyone 5 Ensure that water cannot cause any damage to the location in case it drips out of the unit The equipment is not intended for use in a potentially explosive atmosphere 5 INSPECTING AND HANDLING THE UNIT At delivery the unit should be check...

Страница 8: ...directly into the heat exchanger 2 Drain taps must be provided at all low points of the system to permit complete drainage of the circuit during maintenance or in case of shut down 3 Anti vibration systems in all water piping connected to the chiller are recommended to avoid straining the piping and transmitting vibration and noise Additional water piping delivered with the unit All additional wat...

Страница 9: ...unit so that normal servicing of the water filter can be accomplished without draining the complete system 3 Air purge valves must be provided at all high points of the system The vents should be located at points which are easily accessible for servicing 4 The water filter must be installed in front of the unit for removing dirt from the water to prevent damage to the unit or malfunctioning of th...

Страница 10: ... in the water circuit to make sure that the water pressure will never exceed the maximum allowable working pressure 11 PIPING INSULATION The complete water circuit inclusive all piping must be insulated to prevent condensation and reduction of the cooling capacity 11 1 Antifreeze protection for BPHE and recovery exchangers If the heat exchangers are completely empty and cleaned with antifreeze sol...

Страница 11: ...er power supply 1 Install cable gland to proper tight main power supply cable 2 Using the appropriate cable connect the power circuit to the N L1 L2 and L3 terminals of the unit cable section 2 5 16mm2 3 Connect the earth conductor yellow green to the earthing terminal PE 12 3 Point for attention regarding quality of the public electric power supply This equipment complies with EN IEC 61000 3 11 p...

Страница 12: ...are to keep this equipment in good working order However during operation and maintenance it is essential to observe the following instructions Do not allow unauthorized and or unqualified personnel to access the unit It is forbidden to access the electrical components without having opened the unit main switch and switched off the power supply It is forbidden to access the electrical components w...

Страница 13: ... are process cooling data centres etc Highly Aggressive Environments can be defined as follows Industrial environment with possible concentration of fumes result of combustion and chemical process Coastal environment Highly polluted urban environment Rural environment close to of animal excrement and fertilizers and high concentration of exhaust gas from diesel gener ators Desert areas with risk o...

Страница 14: ...especially for water exchangers pay attention if water rich in calcium carbonate is used An increase in pressure drops or a decrease in thermal efficiency means that the heat exchangers are clogged In environments with a high concentration of airborne particles it might be necessary to clean the condenser bank more often 6 Units placed or stored in a Highly Aggressive Environment for long time wit...

Страница 15: ... time without operation are still subject to those routine maintenance steps Monthly Yearly Seasonal List of Activities Note 8 Weekly Note 1 Note 2 General Reading of operating data Note 3 X Visual inspection of unit for any damage and or loosening X Verification of thermal insulation integrity X Cleaning X Paint where necessary X Analysis of water 4 X Check of flow switch operation X Electrical I...

Страница 16: ...ropriate manner beyond its operating limits or not performing proper maintenance according to this manual can void the warranty Observe the following points to conform to warranty limits 1 The unit cannot function beyond the specified limits 2 The electrical power supply must be within the voltage limits and without voltage harmonics or sudden changes 3 The three phase power supply must not have a...

Страница 17: ...OPTIONAL 9 ACCUMULATOR 10 DISCHARGE STOP VALVE 11 SIGHT GLASS 12 LIQUID SOLENOID VALVE 13 LIQUID STOP VALVE POS COMPONENT CONNECTION D1 COMPRESSOR CONDENSER L1 1 L2 1 CONDENSER THERM EXP VALVE L1 2 L2 2 THERM EXP VALVE EVAPORATOR S1 EVAPORATOR COMPRESSOR S1 1 EVAPORATOR ACCUMULATOR S1 2 ACCUMULATOR COMPRESSOR W1 W3 WATER INLET ASSEMBLY OPTIONAL W2 W4 WATER OUTLET ASSEMBLY OPTIONAL E1 E2 EQUALIZER ...

Страница 18: ...that it can be switched on or off independently of the electrical supply to other items of the plant and equipment in general Refer to the wiring diagram terminals N L1 L2 L3 and PE 4 Supply water to the evaporator and condenser and verify if waterflow is within the limits as given in the table under Water charge flow and quality 5 The piping must be completely purged See also chapter Checking the...

Страница 19: ...D EIMHP01501 22_00EN 19 20 NOTES ...

Страница 20: ...se of its content and the products and services presented therein Specification are subject to change without prior notice Refer to the data communicated at the time of the order Daikin Applied Europe S p A explicitly rejects any liability for any direct or indirect damage in the broadest sense arising from or related to the use and or interpretation of this publication All content is copyrighted ...

Отзывы: