background image

EWAQ+EWYQ005~007AAV3P
Packaged air-cooled water chillers and 
packaged reversible air to water heat pumps
4PW27338-1

Operation manual

8

Tips and tricks

Programming the next day(s)

After confirming the programmed actions of a specific day (i.e. after
pressing the 

<

 button for 5 seconds), press the 

pr

 button once. You

can now select another day by using the 

pi

 & 

pj

 buttons and

restart consulting and programming.

Copying programmed actions to next day

In heating/cooling program it is possible to copy all programmed
actions of a specific day to the next day (e.g. copy all programmed
actions from "

1

" to "

2

").

To copy programmed actions to the next day, proceed as follows:

1

Press the 

<

 button.

The actual mode is blinking.

2

Use the 

pi

 and 

pj

 buttons to select the mode you want

to program.

The selected mode is blinking.

You can leave programming by pressing the 

pr

 button.

3

Press the 

<

 button to confirm the selected mode.

The actual day is blinking.

4

Select the day you would like to copy to the next day by means
of the 

pi

 and 

pj

 buttons.

The selected day is blinking.

You can return to step 

2

 by pressing the 

pr

 button.

5

Press the 

<

 and 

pr

 buttons simultaneously for 5 seconds.

After 5 seconds the display will show the next day (e.g. "

2

" if

"

1

" was selected first). This indicates that the day has been

copied.

You can return to step 

2

 by pressing the 

pr

 button.

Deleting one or more programmed actions

Deleting one or more programmed actions is done at the same time
as storing the programmed actions.

When all actions for one day have been programmed, make sure that
the display shows the highest action number you would like to save.
By pressing the 

<

 button for 5 seconds, you store all actions except

those with a higher action number than the one that is displayed.

E.g. when the 

<

 button is pressed when action number 3 is

displayed, actions 1, 2 and 3 are stored but 4 and 5 are deleted.

Deleting all programmed actions at once

1

Press the 

<

 button twice.

2

Choose the day of the week of which you want to delete all
actions.

3

Press the 

<

 and 

ba

 buttons simultaneously for 5 seconds.

To check, press the 

<

 button again. If no action numbers are

displayed the deletion has been accomplished.

4

Press the 

pr

 button several times to return to normal

operation.

M

AINTENANCE

Maintenance activities

In order to ensure optimal availability of the unit, a number of checks
and inspections on the unit and the field wiring have to be carried out
at regular intervals, preferably yearly. This maintenance should be
carried out by your local Daikin technician.

Besides keeping the remote controller clean by means of a soft damp
cloth, no maintenance is required by the operator.

Standstill

T

ROUBLESHOOTING

The guidelines below, completed by the chapter "Troubleshooting" in
the installatation manual supplied with the unit, might help to solve
your problem. If you cannot solve the problem, consult your installer.

No readings on the remote controller (blank display)

Check if the mains power is still connected to your installation.

One of the error codes appears

Consult your local Daikin dealer.

The schedule timer does work but the programmed actions
are executed at the wrong time (e.g. 1 hour too late or too
early)

Check if the clock and the day of the week are set correctly,
correct if necessary.

I cannot enable the schedule timer (the 

e

e

e

e

 icon is

displayed)

The schedule timer cannot be enabled because another
component with higher priority is in control.

D

ISPOSAL

 

REQUIREMENTS

Dismantling of the unit, treatment of the refrigerant, of oil and of other
parts must be done in accordance with relevant local and national
legislation.

Do not try to dismantle the system yourself: the dismantling of the
system, treatment of the refrigerant, of oil and other parts must be
done by a qualified installer in accordance with relevant local and
national legislation.

Units must be treated at a specialized treatment facility for re-use,
recycling and recovery. By ensuring this product is disposed off
correctly, you will help to prevent potential negative consequences for
the environment and human health. Please contact the installer or
local authority for more information.

During longer periods of standstill, e.g. during summer with
a heating only application, it is very important NOT TO
SWITCH OFF THE POWER SUPPLY towards the unit. 

Switching off the power supply stops the automatic
repetitive movement of the motor in order to prevent it from
getting jammed.

Your product is marked with this symbol. This means
that electrical and electronic products shall not be
mixed with unsorted household waste.

Содержание EWAQ005AAV3P

Страница 1: ...OPERATION MANUAL EWAQ005AAV3P EWAQ006AAV3P EWAQ007AAV3P EWYQ005AAV3P EWYQ006AAV3P EWYQ007AAV3P Packaged air cooled water chillers and packaged reversible air to water heat pumps ...

Страница 2: ...full control over your installation It can control a cooling heating and a cooling only installation Both installations are available in multiple versions which vary in capacity Basic controller functions The basic controller functions are Turning the unit ON OFF Operation mode change over heating refer to Heating operation h on page 4 cooling refer to Cooling operation c on page 4 silent mode ref...

Страница 3: ... icon is displayed whenever a function is not available in your configuration n may also appear due to the restrictions of the user permission level set by the installer 13 DEFROST MODE ICON d This icon indicates that the defrost mode is active 14 COMPRESSOR ICON ç This icon indicates that the compressor in the outdoor unit of the installation is active 15 PUMP ICON é This icon indicates that the c...

Страница 4: ...ser can set the clock and day of the week The controller is equipped with a schedule timer that enables the user to schedule operations Setting the clock and day of the week is required to be able to use the schedule timer Setting the clock 1 Hold down the pr button for 5 seconds The clock read out and the day of week indicator start flashing 2 Use the pi and pj buttons to adjust the clock Each tim...

Страница 5: ...ush the ba button for 5 seconds The b icon and the outgoing water temperature are displayed The icons l and are flashing 2 Use the pi and pj buttons to display The outdoor temperature u icon is flashing The outgoing water temperature h or c is flashing If no button is pressed for 5 seconds the controller leaves the display mode Automatic operation only for heating In automatic operation the controlle...

Страница 6: ...will be executed You can always alter add or remove the programmed actions later When programming heating actions time and setpoint cooling actions are added automatically at the same time but with the predefined default cooling setpoint Conversely when programming cooling actions time and setpoint heating actions are added automatically at the same time but with the default heating setpoint The se...

Страница 7: ...pressing the pr button 9 Use the button to select the action number you would like to program or to modify 10 Use the ba button to select x to switch both cooling or heating and the controller off 9 set the temperature by means of the bi and bj buttons a to select automatic temperature calculation only in heating mode You can change the shift value by means of the bi and bj buttons 11 Use the pi a...

Страница 8: ...cooling or heating actions Consulting cooling or heating is carried out as follows 1 Press the button The actual mode is blinking 2 Use the pi and pj buttons to select the mode current mode or silent mode you want to consult The selected mode is blinking You can leave consultation by pressing the pr button To consult silent mode refer to Consulting silent mode actions on page 7 3 Press the button ...

Страница 9: ...tton several times to return to normal operation MAINTENANCE Maintenance activities In order to ensure optimal availability of the unit a number of checks and inspections on the unit and the field wiring have to be carried out at regular intervals preferably yearly This maintenance should be carried out by your local Daikin technician Besides keeping the remote controller clean by means of a soft d...

Страница 10: ...NOTES NOTES ...

Страница 11: ......

Страница 12: ...Zandvoordestraat 300 B 8400 Oostende Belgium 4PW27338 1 ...

Отзывы: