6 Electrical installation
Installation manual
17
ET9W
Daikin Altherma 3 H HT F
4P644730-1 – 2021.02
A
Y2
7
B
A
B
7 9
X2M
A4P
Y2
YC
X1M
a
b
a
Installation of EKRP1HBAA is required.
b
Prewiring between X2M/7+9 and Q1L (= thermal
protector backup heater). Do NOT change.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.8
To connect the changeover to external
heat source
Wires: 2×0.75 mm²
Maximum load: 0.3 A, 250 V AC
Minimum load: 20 mA, 5 V DC
[9.C]
Bivalent
1
"4.2.1 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the changeover to external heat source cable to the
appropriate terminals as shown in the illustration below.
A
X1
X2
L
N
B
A
B
A4P
X2M
X1
a
X2
a
Installation of EKRP1HBAA is required.
3
Fix the cable with cable ties to the cable tie mountings.
6.3.9
To connect the power consumption digital
inputs
Wires: 2 (per input signal)×0.75 mm²
Power limitation digital inputs: 12 V DC / 12 mA detection
(voltage supplied by PCB)
[9.9]
Power consumption control
.
1
"4.2.1 To open the indoor unit"
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the power consumption digital inputs cable to the
appropriate terminals as shown in the illustration below.
Содержание ETVZ16S23EA9W
Страница 38: ......
Страница 39: ......
Страница 40: ...4P644730 1 2021 02 Copyright 2021 Daikin 4P644730 1 0000000M Verantwortung f r Energie und Umwelt...