8
|
Piping installation
Installer reference guide
86
EPRA14~18D + ETSH/X(B)16P30+50E
Daikin Altherma 3 H HT ECH₂O
4P679467-1C – 2023.07
8 Piping installation
In this chapter
8.1 Preparing water piping
8.1.1 Water circuit requirements
INFORMATION
Also read the precautions and requirements in the
10].
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN 4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
▪
Connecting piping – Legislation.
Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
▪
Connecting piping – Force.
Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.
▪
Connecting piping – Tools.
Only use appropriate tooling to handle brass, which is
a soft material. If NOT, pipes will get damaged.
▪
Connecting piping – Air, moisture, dust.
If air, moisture or dust gets into the
circuit, problems may occur. To prevent this:
-
ONLY use clean pipes.
-
Hold the pipe end downwards when removing burrs.
-
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles from entering the pipe.
-
Use a decent thread sealant to seal connections.
-
When using non-brass metallic piping, make sure to insulate both materials
from each other to prevent galvanic corrosion.
-
Because brass is a soft material, use appropriate tooling for connecting the
water circuit. Inappropriate tooling will cause damage to the pipes.
▪
Insulation.
Insulate up to the base of the heat exchanger.
▪
Freeze.
Protect against freezing.
Содержание ETSXB16E
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P679467 1C 2023 07 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...