7
|
Unit installation
Installer reference guide
72
EPRA14~18D + ETSH/X(B)16P30+50E
Daikin Altherma 3 H HT ECH₂O
4P679467-1C – 2023.07
b
Transportation stay (1×)
Prerequisite:
Open the switch box cover. See
71].
2
2
3
1
3
1
b
c
a
a
b
c
a
Transportation stay
b
Nut
c
Washer
1
Remove the nut (b) and washer (c) from both transportation stays (a).
2
Remove and discard the washers (c) and transportation stays (a).
3
Re-install the nuts (b) of the compressor mounting bolt and tighten to
10.1 N•m of torque.
4
b
a
a
a
a
a
a
Screw
b
Transportation stay
4
Remove the screws (a) (5×) from the transportation stay (b). Put 4 screws (a)
aside for later use (see
"7.2.4 To attach the compressor cover piece"
72]).
5
Remove and discard the transportation stay (b).
7.2.4 To attach the compressor cover piece
Required accessory (delivered with the unit):
Compressor cover piece
Содержание ETSXB16E
Страница 313: ......
Страница 314: ......
Страница 315: ......
Страница 316: ...4P679467 1C 2023 07 Copyright 2022 Daikin Verantwortung f r Energie und Umwelt...