8
|
Piping installation
Installer reference guide
95
ERRA08~12E + ELVH/23E
Daikin Altherma 3 R MT F
4P708474-1 – 2023.05
8 Piping installation
In this chapter
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
Also see
"7.1.4 Special requirements for R32 units"
68] for additional
requirements.
▪
Piping length:
"7.1.3 Installation site requirements of the indoor unit"
▪
Piping material:
phosphoric acid deoxidised seamless copper