background image

ERHQ006~0 ERLQ006~008BBV3

Outdoor unit for air to water heat pump

4PW68002-1A – 03.2011

Installation manual

13

12.4. Complete recharging

In case complete recharging is required, refer to the nameplate of the
unit. The nameplate states the type of refrigerant and necessary
amount.

Total charging amount <unit: kg>

Charge of refrigerant (kg) depends on total liquid piping length.

Total refrigerant charge=1.7 

kg + (total length (m) of liquid

piping–10 m) x 0.02

Remark: Factory refrigerant charge is 1.7 kg.

13. P

UMP

 

DOWN

 

OPERATION

In order to protect the environment, be sure to pump down when
relocating or disposing of the unit. The pump down operation will
extract all refrigerant from the piping into the outdoor unit.

13.1. Pump down procedure

1

Remove the valve lid from liquid stop valve and gas stop valve.

2

Carry out the forced cooling operation.

3

After 5 to 10 minutes (after only 1 or 2 minutes in case of very
low ambient temperatures (<–10°C)), close the liquid stop valve
with a hexagonal wrench.

4

After 2-3 minutes, close the gas stop valve and stop forced
cooling operation.

1

Gas stop valve

2

Close

3

Hexagonal wrench

4

Valve lid

5

Liquid stop valve

13.2. Forced cooling operation

1

Press the forced operation switch SW1 to begin forced cooling.

2

Press the forced operation switch SW1 again to stop forced
cooling.

1

Forced operation switch SW1

14. E

LECTRICAL

 

WIRING

 

WORK

14.1. Precautions on electrical wiring work

Use only copper wires.

A main switch or other means for disconnection, having a
contact separation in all poles, must be incorporated in the fixed
wiring in accordance with applicable legislation.

Never squeeze bundled cables into a unit.

Fix cables so that cables do not make contact with the pipes
(especially on high pressure side).

Secure the electrical wiring with cable ties as shown in the figure
in chapter 

"14.3. Connecting power supply and interunit wiring"

on page 14

 so that it does not come in contact with the piping,

particularly on the high-pressure side.
Make sure no external pressure is applied to the terminal
connectors.

When installing the earth leakage circuit breaker make sure that
it is compatible with the inverter (resistant to high frequency
electrical noise) to avoid unnecessary opening of the earth
leakage circuit breaker.

The power supply cable and circuit breaker must be selected in
accordance with applicale legislation.

Do not use tapped wires, stranded conductor wires (see caution
1 under 

"Notes to observe" on page 15

), extension cords, or

connections from a star system, as they may cause overheating,
electrical shock or fire.

NOTICE

Before recharging, make sure to execute vacuum drying of
the internal piping of the unit as well.

1

3

2

4

4

5

LED-A

SW4

ON

AB

C

D

S102

SW1

S2

1

NOTICE

Take care that while running forced cooling operation the
water temperature remains higher than 5°C (see
temperature read out of the indoor unit). You can achieve
this, for example, by activating all fans of the fan coil units.

WARNING

All wiring must be performed by an authorized
electrician.

Electrical connections shall be made to fixed wiring.

All components procured on the site and all electric
construction shall comply with the applicable
legislation.

DANGER: HIGH VOLTAGE

To avoid electrical shock, make sure to disconnect the
power supply 1 minute or more before servicing the
electrical parts. Even after 1 minute, always measure the
voltage at the terminals of main circuit capacitors or
electrical parts and, before touching, make sure that those
voltages are 50 V DC or less.

NOTICE

To persons in charge of electrical wiring work:

Do not operate the unit until the refrigerant piping is
complete. (Running it before the piping is ready will break
the compressor.)

DANGER

Before obtaining access to terminal devices, all supply
circuits must be interrupted.

Be sure to install an earth leakage circuit breaker in
accordance with applicable legislation. Failure to do
so may cause electrical shock.

Do not turn on the main switch until all the wiring is
completed. 

Содержание ERHQ006BBV3

Страница 1: ...INSTALLATION MANUAL ERHQ006BBV3 ERHQ007BBV3 ERHQ008BBV3 ERLQ006BBV3 ERLQ007BBV3 ERLQ008BBV3 Outdoor unit for air to water heat pump...

Страница 2: ...lingen van 05 siguiendo las disposiciones de 06 secondo le prescrizioni per 07 v v v 08 de acordo com o previsto em 09 10 under iagttagelse af bestemmelserne i 11 enligt villkoren i 12 gitt i henhold...

Страница 3: ...Forced cooling operation 13 14 Electrical wiring work 13 14 1 Precautions on electrical wiring work 13 14 2 Internal wiring Parts table 14 14 3 Connecting power supply and interunit wiring 14 Notes t...

Страница 4: ...vities described in this manual shall be carried out by an installer Be sure to wear adequate personal protection equipment protection gloves safety glasses when performing installation maintenance or...

Страница 5: ...se electrical shock and re Electrical work must be carried out in accordance with the installation manual and the national electrical wiring rules or code of practice Insuf cient capacity or incomplet...

Страница 6: ...pressor may result Be sure to con rm the model name and the serial no of the outer front plates when attaching detaching the plates to avoid mistakes When closing the service panels take care that the...

Страница 7: ...or 9 Compressor 10 Liquid stop valve 11 Gas stop valve 12 Service port 4 3 Functional diagram 1 Thermistor air 2 Heat exchanger 3 Thermistor heat exchanger 4 Fan motor 5 Filter 6 Electronic expansion...

Страница 8: ...n be avoided as much as possible Do not install the unit in places often used as work place In case of construction works e g grinding works where a lot of dust is created the unit must be covered Do...

Страница 9: ...stallation ground so that the unit will not cause any operating vibration or noise after installation 2 Prepare 4 sets of M8 or M10 foundation bolts nuts and washers each eld supply 3 Fix the unit sec...

Страница 10: ...ng three sides unit mm 7 1 Outdoor unit installation drawing 1 Wrap the insulation pipe with nishing tape from bottom to top 2 Service cover 3 Stop valve cover 4 250 mm from wall Allow space for pipin...

Страница 11: ...into the system Vacuum pump Use a 2 stage vacuum pump with a non return valve Make sure the pump oil does not ow oppositely into the system while the pump is not working Use a vacuum pump which can ev...

Страница 12: ...erial polyethylene foam Heat transfer rate 0 041 to 0 052 W mK 0 035 to 0 045 kcal mh C Refrigerant gas pipe s surface temperature reaches 110 C max Choose heat insulation materials that will withstan...

Страница 13: ...m pumping Check that the compound pressure gauge reads 0 1 MPa 760 mm Hg 4 Close the gauge manifold s low pressure valve Lo and stop the vacuum pump Leave as is for 4 5 minutes and make sure that the...

Страница 14: ...iphon attached or something similar Be sure to use tools exclusively for R410A to ensure required pressure resistance and to prevent foreign materials from mixing into the system 12 3 Calculating the...

Страница 15: ...t it does not come in contact with the piping particularly on the high pressure side Make sure no external pressure is applied to the terminal connectors When installing the earth leakage circuit brea...

Страница 16: ...X11A X12A Connector X1M X2M Terminal strip Y1E Electronic expansion valve voil Y1R Reversing solenoid valve coil Z1C Z7C Ferrite core Only for ERLQ 14 3 Connecting power supply and interunit wiring 1...

Страница 17: ...y may cause heat and re Strip the wire at terminal block L N 1 2 3 C A 3 1 4 5 4 2 B 2 1 1 Stranded conductor wire 2 Round crimp style terminal 1 Strip wire end to this point 2 Excessive strip length...

Страница 18: ...S 18 1 Technical specifications 18 2 Electrical specifications INFORMATION If the circuit breaker trips to shut off the power to the outdoor unit the system will restore the original operation mode wh...

Страница 19: ......

Страница 20: ...4PW68002 1A 03 2011 Copyright 2011 Daikin...

Отзывы: