8
|
Piping installation
Installer reference guide
74
ERGA04~08EAV3(A) + EHBH/X04+08EA/EJ6V+9W
Daikin Altherma 3 R W
4P629085-1 – 2020.08
8 Piping installation
In this chapter
8.1 Preparing refrigerant piping
8.1.1 Refrigerant piping requirements
INFORMATION
Also read the precautions and requirements in the
▪
Piping material:
Phosphoric acid deoxidised seamless copper.
▪
Piping diameter:
Liquid piping
Ø6.4 mm (1/4")
Gas piping
Ø15.9 mm (5/8")
▪
Piping temper grade and thickness:
Содержание ERGA04EAV3A
Страница 263: ...11 11...
Страница 264: ...4P629085 1 2020 08 Copyright 2020 Daikin Verantwortung f r Energie und Umwelt...