7
IMPORTANT NOTES:
Make sure that the expansion valve is installed vertically.
Make sure there is enough free space for future maintenance.
Figure 4 shows the required service space.
≥24” (600 mm) ≥10” (250 mm)
≥10” (250 mm)
≥ 4”
(10
0 m
m
)
≥ 6”
(10
0 m
m
)
≥ 4
” (1
00
m
m
)
5
Figure 4
Brazing
For details, see manual of the outdoor unit.
3. Prepare the inlet/outlet field piping just in front of the con-
nection (do
not
braze yet).
13-3
/8”
(3
40
mm
)
7-9/16” (192.5 mm)
C
B
A
Figure 5
A: Inlet coming from the outdoor unit
B: Outlet to air handler unit
C: Pipe fixing clamp
4. Remove the pipe fixing clamp (C) by unscrewing 2 x 10-32”
(M5) screws.
5. Remove the upper and lower pipe insulations.
6. Braze the field piping.
T
O
AVOID
POSSIBLE
DAMAGE
TO
PIPING
:
-C
OOL
THE
FILTERS
AND
VALVE
BODY
WITH
A
WET
CLOTH
AND
MAKE
SURE
THE
BODY
TEMPERATURE
DOES
NOT
EXCEED
248°F (120
DURING
BRAZING
.
-E
NSURE
THAT
THE
OTHER
PARTS
(
SUCH
AS
ELECTRICAL
BOX
,
TIE
WRAPS
AND
WIRES
)
ARE
PROTECTED
FROM
DIRECT
BRAZING
FLAMES
°C)
WARNING
7. After brazing, put the lower pipe insulation back in place and
close it with the upper insulation cover (after pealing off the
liner).
8. Secure the pipe fixing clamp (C) in place again 2 x 10-32”
(M5).
9. Make sure that field pipes are fully insulated. Field pipe
insulation must reach up to the insulation you have put back
in place as per procedure step 7. Make sure that there is
no gap between both ends in order to avoid condensation
dripping (finish the connection with tape eventually).
Electrical
HIGH VOLTAGE!
D
ISCONNECT
ALL
POWER
BEFORE
SERVICING
.
M
ULTIPLE
POWER
SOURCES
MAY
BE
PRESENT
. F
AILURE
TO
DO
SO
MAY
CAUSE
PROPERTY
DAMAGE
,
PERSONAL
INJURY
OR
DEATH
.
WARNING
T
O
AVOID
THE
RISK
OF
FIRE
OR
EQUIPMENT
DAMAGE
,
USE
COPPER
CONDUCTORS
ONLY
.
WARNING
1. Open the electrical box cover (A).
2. Push out ONLY the second lower wire intake hole (B) from
inside to outside. Do not damage the membrane.
3. Pass valve cable (with wires Y1...Y6) from the control box
through that membrane wire intake hole and connect the
cable wires into the terminal connector (C) following instruc-
tions as described in step 4. Route the cable out of the valve
kit box according to figure below and fix with the tie wrap
(D). See “Electric wiring work” for more details.
Содержание EKEQFCBAV3-US
Страница 17: ...17 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 18: ...18 THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 19: ...19 THIS PAGE INTENTIONALLY LEFT BLANK...