7
|
Unit installation
Installer reference guide
61
ERLA EHFZ03S18DJ3V
Daikin Altherma 3 R F
4P596821-1B – 2021.10
7.4 Mounting the indoor unit
7.4.1 About mounting the indoor unit
When
You have to mount the outdoor and indoor unit before you can connect the
refrigerant and water piping.
Typical workflow
Mounting the indoor unit typically consists of the following stages:
1
Installing the indoor unit.
2
Connecting the drain hose to the drain.
7.4.2 Precautions when mounting the indoor unit
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
"2 General safety precautions"
▪
"7.1 Preparing the installation site"
7.4.3 To install the indoor unit
1
Lift the indoor unit from the pallet and place it on the floor. Also see
2
Connect the drain hose to the drain. See
"7.4.4 To connect the drain hose to
62].
3
Slide the indoor unit into position.
4
Adjust the height of the leveling feet to compensate for floor irregularities.
The maximum allowed deviation is 1°.
≤1°
NOTICE
Do NOT tilt the unit forwards:
0°
1° 1°
Содержание EHFZ03S18DJ3V
Страница 1: ...Installer reference guide Daikin Altherma 3 R F ERLA03DAV3 EHFZ03S18DJ3V...
Страница 211: ......
Страница 212: ...4P596821 1B 2021 10 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...