ESIE13-03
|
Part 3. Repair
2. Unit specific repair procedures
13/05/15
|
Version 2.0
Page 87
Ground source heat pump
4. Put the other end of the hose in a recipient with a capacity of 10 liter.
5. Open the brine circuit drain valve DR1 (2) and wait until brine no longer exits the drain hose.
6. Close the brine circuit drain valve DR1 (2) and remove the hose from the brine circuit drain (1).
Figure 6 - Draining the brine circuit
2.1.4. Air purge of the brine circuit
To perform an air purge or the brine circuit, refer to the instructions of the field supplied brine filling equipment.
2.1.5. Draining the water circuit
2.1.5.1 Procedure
1. Switch off the Daikin Altherma GSHP via the user interface.
2. Close the field supplied water shut off valves.
3. Open the sound insulation of the heat pump module, refer to
"Opening the sound insulation of the heat pump module (front
4. Connect a hose to the water circuit drain (1).
5. Depressurize the water circuit by opening the water circuit pressure relief valve.
6. Open the water circuit drain valve DR4 (2).
7. Keep the water circuit pressure relief valve open to allow air to enter into the water circuit.
1. Brine circuit drain
2. Brine circuit drain valve DR1
1
2
Содержание EGSQH10S18AA9W
Страница 1: ...Service Manual Ground source heat pump EGSQH10S18AA9W ESIE13 03 Version 2 0 ...
Страница 82: ...ESIE13 03 Part 2 Troubleshooting 4 Component checklist Page 82 13 05 15 Version 2 0 Ground source heat pump ...
Страница 148: ...ESIE13 03 Part 3 Repair 2 Unit specific repair procedures Page 148 13 05 15 Version 2 0 Ground source heat pump ...