ESIE13-03
|
Part 3. Repair
2. Unit specific repair procedures
13/05/15
|
Version 2.0
Page 133
Ground source heat pump
Installation
1. Proceed in reverse order.
2. Fill the brine circuit, refer to “To fill the brine circuit” in the Daikin Altherma ground source heat pump Installer reference guide.
2.2.20. Replacing the electronic expansion valve K1E body
2.2.20.1 Preliminary actions
1. Remove the front panel, refer to
"Removing the front panel" on page 85
2. Remove the switch box cover, refer to
"Removing the switch box cover" on page 89
.
3. Open the Sound Insulation of the heat pump module (front side only),
"Opening the sound insulation of the heat pump module
2.2.20.2 Procedure
Removal
1. Remove the motor (1) from the expansion valve.
2. Cut the 2 tie wraps (2).
3. Slide the insulation (3) downwards.
4. Remove temperature sensor R4T (4) from its support, refer to
"Replacing a thermistor (except R10T)" on page 143
.
I
NFORMATION
When installing the brine manometer, use a tie wrap to fix the capillary against the insulated pipe to ensure strain
relief.
C
AUTION
Use welding blankets and cooling clamps to protect the components that surround the expansion valve.
Содержание EGSQH10S18AA9W
Страница 1: ...Service Manual Ground source heat pump EGSQH10S18AA9W ESIE13 03 Version 2 0 ...
Страница 82: ...ESIE13 03 Part 2 Troubleshooting 4 Component checklist Page 82 13 05 15 Version 2 0 Ground source heat pump ...
Страница 148: ...ESIE13 03 Part 3 Repair 2 Unit specific repair procedures Page 148 13 05 15 Version 2 0 Ground source heat pump ...