DCC601A51
intelligent Tab Controller
4P420109-1 – 2015.10
Installer reference guide
14
5
In this window, click
A/C Auto Register
to display the
Auto
Search Result
window.
All connected devices will automatically be displayed in the
Search Result List
. All search results will have both the type of
unit and their specific port and DIII-NET address.
6
For management points whose type is unknown
(Detailed Type = "
-
"), you can do the following:
a.
Select one of the unknown management points.
b.
Click
Detailed Type
.
c.
In the
Management Point Types
window, select the desired
type and confirm.
7
Click
Add All
if you want to add all management points to the
Register Candidate List
.
8
Click
OK
to register all devices from the register candidate list.
9
Click
OK
in the data register to return to the main menu.
10
If you use the stand-alone mode, your intelligent Tab Controller
app is now set up and ready to use.
11
If you use the cloud-connect mode, continue with the net
commissioning. Refer to
"9.8. Net commissioning" on page 14
.
9.8.
Net commissioning
If you chose the cloud-connect mode, you will need to configure and
upload your configuration and settings to the cloud. To do so, you will
do the following:
Activate the net commissioning mode.
Detect all connected (Daikin) equipment.
Configure the connected (Daikin) equipment.
Enter your cloud credentials.
Upload the configuration to the cloud.
9.8.1.
Preparations
To connect the intelligent Tab Controller to the cloud, prepare the
following:
Make sure both your computer and the intelligent Tab Controller
are connected to the desired LAN network and the internet.
Make sure the function mode of the intelligent Tab Controller is
set to
Cloud-connect Mode
.
Make sure all desired (Daikin) equipment is connected to the
intelligent Tab Controller and the power is turned on.
Make sure to set an AirNet address for all indoor units and
outdoor units, and a DIII-NET address for indoor units, using a
connected wired remote controller.
Make sure you have a list with all connected (Daikin) equipment
with the following information:
Port and DIII-NET address
Model name
Serial number
Installation place
Make sure you obtained the following cloud credentials:
LC No: The registered id number of the intelligent Tab
Controller. This number will be in the following format:
LL1N###### (with # being a numerical value).
Your cloud User ID
9.8.2.
Activating the commissioning mode ([1] Start
Commissioning)
To activate the net commissioning mode, proceed as follows:
1
Start the commissioning tool and click
Net Commissioning
Tool
.
2
Enter the password (default: "
daikin
") and confirm with
OK
.
The
Net Commissioning Tool
window will be displayed.
3
Click
Start Commissioning
to activate the net commissioning
mode. If the button is disabled, the intelligent Tab Controller is
already in commissioning mode, and then this step is not
required.
INFORMATION
If one of the connected units is not displayed in this list,
you can manually add them. To do so, refer to
"10. Advanced configuration of the intelligent Tab
Controller" on page 17
.
INFORMATION
If the upper limit of registration is reached, the
Add
and
Add All
buttons will be greyed out.
In this case, you’ll need to remove one or more
management points from the list, before you can add new
ones.
INFORMATION
The CPU module will restart.
The commissioning tool will
not
automatically restart. To
continue, exit the commissioning tool and start it again.
INFORMATION
The net commissioning needs to be redone each time you
reconfigure your environment (for example, editing, adding
or removing equipment using the local commissioning
tool).