
SYSTEM OPERATION
13
46-1/10”
GAS INLET LOCATION (3/4” NPT)
46-1/10”
46-1/10”
74-11/12”
HOOD LOCATED
INSIDE HEAT SECTION
DURING SHIPPING
DOOR
PROVIDE
CLEARANCE
FOR REMOVAL OF
ACCESS PANELS
DRIP LEG
GROUND
JOINT
UNION
MANUAL
SHUT OFF
VALVE
Proper Piping Practice
NOTE:
The unit gas supply entrance is factory sealed with
plugs. Keep plugs in place until gas supply is ready to be
installed. Once ready, replace the plugs with the supplied
grommets and install gas supply line.
Gas Piping Checks
T
O
PREVENT
PROPERTY
DAMAGE
OR
PERSONAL
INJURY
DUE
TO
FIRE
,
THE
FOLLOWING
INSTRUCTIONS
MUST
BE
PERFORMED
REGARDING
GAS
CONNECTIONS
AND
PRESSURE
TESTING
:
• T
HE
UNIT
AND
ITS
GAS
CONNECTIONS
MUST
BE
LEAK
TESTED
BEFORE
PLACING
IN
OPERATION
. B
ECAUSE
OF
THE
DANGER
OF
EXPLOSION
OR
FIRE
,
NEVER
USE
A
MATCH
OR
OPEN
FLAME
TO
TEST
FOR
LEAKS
. N
EVER
EXCEED
SPECIFIED
PRESSURES
FOR
TESTING
.
H
IGHER
PRESSURE
MAY
DAMAGE
GAS
VALVE
AND
CAUSE
OVERFIRING
WHICH
MAY
RESULT
IN
PREMATURE
HEAT
EXCHANGE
FAILURE
.
• T
HIS
UNIT
AND
ITS
SHUT
-
OFF
VALVE
MUST
BE
DISCONNECTED
FROM
THE
GAS
SUPPLY
DURING
ANY
PRESSURE
TESTING
OF
THAT
SYSTEM
AT
TEST
PRESSURES
IN
EXCESS
OF
1/2 PSIG (3.48
K
P
A
).
• T
HIS
UNIT
MUST
BE
ISOLATED
FROM
THE
GAS
SUPPLY
SYSTEM
BY
CLOSING
ITS
MANUAL
SHUT
-
OFF
VALVE
DURING
ANY
PRESSURE
TESTING
OF
THE
GAS
SUPPLY
PIPING
SYSTEM
AT
TEST
PRESSURES
EQUAL
TO
OR
LESS
THAN
1/2 PSIG (3.48
K
P
A
).
CAUTION
T
O
AVOID
PROPERTY
DAMAGE
OR
PERSONAL
INJURY
,
BE
SURE
THERE
IS
IN
THE
VICINITY
DURING
AIR
BLEEDING
.
NO
OPEN
FLAME
WARNING
There will be air in the gas supply line after testing for leaks
on a new installation. Therefore, the air must be bled from
the line by loosening the ground joint union until pure gas is
expelled. Tighten union and wait for five minutes until all gas
has been dissipated in the air. Be certain there is no open
flame in the vicinity during air bleeding procedure. The unit is
placed in operation by closing the main electrical disconnect
switch for the unit.
PROPANE GAS INSTALLATIONS
T
O
AVOID
PROPERTY
DAMAGE
,
PERSONAL
INJURY
OR
DEATH
DUE
TO
FIRE
OR
EXPLOSION
CAUSED
BY
A
PROPANE
GAS
LEAK
,
INSTALL
A
GAS
DETECTING
WARNING
DEVICE
. S
INCE
RUST
CAN
REDUCE
THE
LEVEL
OF
ODORANT
IN
PROPANE
GAS
,
A
GAS
DETECTING
WARNING
DEVICE
IS
THE
ONLY
RELIABLE
WAY
TO
DETECT
A
PROPANE
GAS
LEAK
. C
ONTACT
A
LOCAL
PROPANE
GAS
SUPPLIER
ABOUT
INSTALLING
A
GAS
DETECTING
WARNING
DEVICE
.
WARNING
IMPORTANT NOTE:
Propane gas conversion kits must be
installed to convert units to propane gas.
All propane gas equipment must conform to the safety
standards of the National Board of Fire Underwriters (See
NBFU Manual 58). Line pressure 11.3 - 14” w.c.
Содержание DBG Series
Страница 51: ...51 ACCESSORIES GAS ELECTRIC...
Страница 52: ...ACCESSORIES 52 GAS ELECTRIC...
Страница 53: ...53 ACCESSORIES...
Страница 54: ...ACCESSORIES 54...
Страница 95: ...95 DBC COMMERCIAL 15 25 Ton Packaged Air Conditioner Unit WIRING DIAGRAMS...
Страница 100: ...100 DBG COMMERCIAL 15 25 Ton Packaged Gas Electric Unit WIRING DIAGRAMS...