3
|
Components
Service manual
113
ATXP20~35 + FTXP20~71 + ARXP20~35 + RXP20~71
Split Comfora R32
ESIE18-01D – 2022.02
a
a
Compressor wire terminals cover
4
Install the compressor insulation.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
3.12 Swing flap motor
3.12.1 Checking procedures
To perform an electrical check of the swing flap motor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
1
Disconnect the swing flap motor connector from the indoor unit main PCB.
2
Measure the resistance between the following pins of the motor connector.
Result:
The measurements MUST be as shown in the table below.
Pins
Measured resistance (Ω)
1-2
232.5~267.5
1-3
1-4
1-5
2-3
465~535
2-4
2-5
3-4
3-5
4-5
Содержание Comfora ARXP20L
Страница 170: ......
Страница 171: ......
Страница 172: ...ESIE18 01D 2022 02 Copyright 2019 Daikin Verantwortung f r Energie und Umwelt...