![Daikin BEVN125AV1 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/daikin/bevn125av1/bevn125av1_installation-manual_2460440014.webp)
12
English
8-3 CONNECTION OF WIRING
• Perform wiring connections after completion of refrigerant piping work.
• Check that all the power supply lines are shut off.
• Loosen the two screws of the EL. COMPO. BOX, remove the lid, and connect each wire as shown in Fig. 6.
• When all the wiring work is completed, attach and secure the lid of the EL. COMPO. BOX.
•
Power supply wiring and Ground wire
Connect the power supply wires to terminals L and N of the power supply terminal block (X1M).
Connect the ground wire to the ground terminal. At that time, pull the power supply wires into the equipment
along with the ground wire through the wiring through hole, and bundle and fix the wires securely with the
accessory clamp (1).
Clasp
Clasp
Clasp
Ground terminal
EL. COMPO.
BOX lid
Indoor unit
inter-unit wiring
Power supply wiring
Power supply
wiring
Ground
wire
Ground wire
Clamp (1)
(accessory)
Clamp (1)
(accessory)
Clamp (1)
(accessory)
Outdoor unit
inter-unit wiring
Arrow view
Clamp (1)
(accessory)
Clasp
High
voltage
Low
voltage
Power supply wiring
Transmission wiring (Indoor unit inter-unit wiring)
Transmission wiring (Outdoor unit inter-unit wiring)
Ground wire
Fig. 6
Clamp (1)
Clasp
Clasp
Indoor unit
inter-unit wiring
Outdoor unit
inter-unit wiring
(accessory)
Clamp (1)
(accessory)
TO IN/D
UNIT
F1 F2 F1 F2
X1A
TO OUT/D
UNIT
L
N
01_EN_3P233622-3F.fm Page 12 Monday, December 22, 2008 10:59 AM
Содержание BEVN125AV1
Страница 16: ...0901 HT 3P233622 3F EM08A070B...