6 Installation
Installer reference guide
19
AZQS100~14 AZQS100~140B7Y1B
Split system air conditioners
4P385529-1B – 2016.10
c
a
d
e
1~50 Hz
220-240 V
3N~50 Hz
380-415 V
V1
Y1
L1 L2 L3
L1 L2 L3
N
b
b
a
Interconnection cable
b
Power supply cable
c
Earth leakage circuit breaker
d
Fuse
e
User interface
a
b
V1
Y1
c
c
c
c
d
d
e
e
f
f
a
Switch box
b
Stop valve attachment plate
c
Earth
d
Cable tie
e
Interconnection cable
f
Power supply cable
4
Fix the cables (power supply and interconnection cable) with a
cable tie to the stop valve attachment plate.
5
Route the wiring through the frame and connect it to it.
Routing through
the frame
Choose one of the 3 possibilities:
a
b
a
b
a
b
2
3
1
a
Power supply cable
b
Interconnection cable
Connecting to the
frame
When cables are routed from the unit, a
protection sleeve for the conduits (PG
insertions) can be inserted at the knockout
hole.
When you do not use a wire conduit,
protect the wires with vinyl tubes to
prevent the edge of the knockout hole from
cutting the wires.
a b c
d
e
A B
A
Inside of the outdoor unit
B
Outside of the outdoor unit
a
Wire
b
Bush
c
Nut
d
Frame
e
Hose
6
Reattach the service cover. See
7
Connect an earth leakage circuit breaker and fuse to the power
supply line.
6.8
Finishing the outdoor unit
installation
6.8.1
To finish the outdoor unit installation
1
Insulate and fix the refrigerant piping and interconnection cable
as follows:
f
b
a
e
d
c
a
Gas pipe
b
Gas pipe insulation
c
Interconnection cable
d
Liquid pipe
e
Liquid pipe insulation
f
Finishing tape
2
Install the service cover.
6.8.2
To close the outdoor unit
NOTICE
When closing the outdoor unit cover, make sure that the
tightening torque does NOT exceed 4.1 N•m.
Содержание AZQS140B8V1B
Страница 27: ......
Страница 28: ...4P385529 1B 2016 10 Copyright 2014 Daikin...