
9
■
English
Indoor Unit Installation
6.
When connecting to an HA system
1) Remove the front grille. (5 screws)
2) Remove the metal plate electric parts box cover. (6 tabs)
3) Insert the connection cord to the HA connector “S21”.
4) Lay the connecting cord as shown in the figure below.
5) Restore the electric parts box cover and the front grill.
7.
Drain piping
1) Connect the drain hose, as described right.
2) Remove the air filters and pour some water into the drain pan to check the
water flows smoothly.
3) When drain hose requires extension, obtain an extension hose commercially
available.
Be sure to thermally insulate the indoor section of the extension hose.
4) When connecting a rigid polyvinyl chloride pipe
(nominal diameter 13mm) directly to the drain
hose attached to the indoor unit as with
embedded piping work, use any commercially
available drain socket (nominal diameter
13mm) as a joint.
Electric parts
box cover
6 tabs
HA connector
“S21”
HA harness
PCB
Electric parts box
The drain hose should
be inclined downward.
No trap is permitted.
Do not put the end
of the hose in water.
Indoor unit
drain hose
φ
18
Extension drain hose
Heat insulation tube
(Field supply)
Drain hose supplied with
the indoor unit
Commercially available drain
socket
(nominal diameter 13mm)
Commercially available rigid
polyvinyl chloride pipe
(nominal diameter 13mm)
φ
18
01_EN_3P166464-1.fm Page 9 Saturday, September 17, 2005 11:08 AM
Содержание ATXG25EV1B
Страница 15: ... 0511 HT 3P166464 1 M05B043 ...