4
x
Set-up and installation
Daikin Altherma M ECH
2
O
Solar storage tank with heating controller
008.1446799_00 – 07/2019 – EN
Installation and maintenance instructions
17
4.3
Removing the cover and thermal insulation
●
Raise the cover at the rear and remove forwards.
Fig.
4-6
Remove the protective cover
If the installation conditions require the hydraulic con-
nection directly upwards, the cover can be cut out along
the broken line.
Fig.
4-7
Producing the cover cut-out
Fig.
4-8
Daikin Altherma M ECH
2
O without protective cover
CAUTION!
A) consists
of pressure-sensitive EPP moulded parts that
can be easily damaged if not handled correctly.
●
Only remove the thermal insulation in the
order stated below and in the stated direc-
tions.
●
Do not use force.
●
Do not use tools.
●
Remove the thermal insulation in the following order:
– Pull the side insulating element off horizontally (fig.
item
A).
– Pull the rear insulating element off horizontally (fig.
item
B).
– Pull the front insulating element off horizontally (fig.
item
C).
Fig.
4-9
Removing the top thermal insulation
●
As required:
Remove the bottom thermal insulation in the fol-
lowing order:
– Pull the side insulating element off vertically (fig.
4-10,
item
A).
– Pull the rear insulating element off vertically (fig.
item
B).
Содержание Altherma EBLQ05C2V3
Страница 68: ...008 1446799_00 07 2019 EN Copyright Daikin ...