9
|
Electrical installation
Installer reference guide
102
EPRA08~W1 + ET9W
Daikin Altherma 3 H MT F
4P634887-1 – 2021.03
NOTICE
Do NOT cut or remove the backup heater power supply cable.
9.3.3 To connect the shut-off valve
INFORMATION
Shut-off valve usage example.
In case of one LWT zone, and a combination of
underfloor heating and heat pump convectors, install a shut-off valve before the
underfloor heating to prevent condensation on the floor during cooling operation.
For more information, see the installer reference guide.
Wires: 2×0.75 mm²
Maximum running current: 100 mA
230 V AC supplied by PCB
[2.D]
Shut off valve
1
"7.2.5 To open the indoor unit"
54]):
1
Top panel
1
2
3
2
User interface panel
3
Upper switch box cover
2
Connect the valve control cable to the appropriate terminals as shown in the
illustration below.
NOTICE
Wiring is different for a NC (normally closed) valve and a NO (normally open) valve.
A
M2S
Содержание Altherma 3 H MT F
Страница 274: ......
Страница 275: ......
Страница 276: ...4P634887 1 2021 03 Copyright 2021 Daikin Verantwortung f r Energie und Umwelt...