8 Piping installation
In this chapter
8.1 Preparing water piping
8.1.1 Water circuit requirements
INFORMATION
Also read the precautions and requirements in the
NOTICE
In case of plastic pipes, make sure they are fully oxygen diffusion tight according to
DIN 4726. The diffusion of oxygen into the piping can lead to excessive corrosion.
▪
Connecting piping – Legislation.
Make all piping connections in accordance with
the applicable legislation and the instructions in the "Installation" chapter,
respecting the water inlet and outlet.
▪
Connecting piping – Force.
Do NOT use excessive force when connecting the
piping. Deformation of the piping can cause malfunctioning of the unit.
▪
Connecting piping – Tools.
Only use appropriate tooling to handle brass, which is
a soft material. If NOT, pipes will get damaged.
▪
Connecting piping – Air, moisture, dust.
If air, moisture or dust gets into the
circuit, problems may occur. To prevent this:
-
ONLY use clean pipes.
-
Hold the pipe end downwards when removing burrs.
-
Cover the pipe end when inserting it through a wall, to prevent dust and/or
particles from entering the pipe.
-
Use a decent thread sealant to seal connections.
-
When using non-brass metallic piping, make sure to insulate both materials
from each other to prevent galvanic corrosion.
-
Because brass is a soft material, use appropriate tooling for connecting the
water circuit. Inappropriate tooling will cause damage to the pipes.
▪
Insulation.
Insulate up to the base of the heat exchanger.
▪
Freeze.
Protect against freezing.