9
|
Electrical installation
Installer reference guide
75
EPGA11~16DAV3(7) + EA23DA6V(7)+9W
Daikin Altherma 3 H F
4P556075-1A – 2021.09
9 Electrical installation
In this chapter
9.1 About connecting the electrical wiring
Before connecting the electrical wiring
Make sure the water piping is connected.
Typical workflow
Connecting the electrical wiring typically consists of the following stages:
1
Making sure the power supply system complies with the electrical
specifications of the heat pump.
2
Connecting the electrical wiring to the outdoor unit.
3
Connecting the electrical wiring to the indoor unit.
4
Connecting the main power supply.
5
Connecting the backup heater power supply.
6
Connecting the shut-off valves.
7
Connecting the electrical meters.
8
Connecting the domestic hot water pump.
9
Connecting the alarm output.
10
Connecting the space heating ON/OFF output.
11
Connecting the changeover to an external heat source.
12
Connecting the power consumption digital inputs.
13
Connecting the safety thermostat.
9.1.1 Precautions when connecting the electrical wiring
INFORMATION
Also read the precautions and requirements in the following chapters:
▪
General safety precautions
▪
Preparation
Содержание Altherma 3 H F
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ...4P556075 1A 2021 09 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...