7
|
Unit installation
Installer reference guide
52
EPGA11~16DAV3(7) + EA23DA6V(7)+9W
Daikin Altherma 3 H F
4P556075-1A – 2021.09
▪
"7.2.6 To lower the switch box on the indoor unit"
▪
"7.4.4 To connect the drain hose to the drain"
▪
When you need access to the high voltage switch box
2×
T25
5
If you need access to the high voltage components, remove the high voltage
switch box cover.
4×
T25
7.2.6 To lower the switch box on the indoor unit
During the installation, you will need access to the inside of the indoor unit. To
have easier front access, put the switch box lower on the unit as follows:
Prerequisite:
The user interface panel and front panel have been removed.
1
Remove the fixing plate at the top of the unit.
2
Tilt the switch box to the front and lift it out of its hinges.
Содержание Altherma 3 H F
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ...4P556075 1A 2021 09 Copyright 2018 Daikin Verantwortung für Energie und Umwelt ...