![Daikin 2MKS70JVLT Скачать руководство пользователя страница 19](http://html.mh-extra.com/html/daikin/2mks70jvlt/2mks70jvlt_service-manual_501076019.webp)
Si121176
Removal of Electrical Box
Removal Procedure
17
4
Disconnect the
connector for the four
way valve coil [S80].
Pull out the clamp.
5
Disconnect the
connectors for the
electronic expansion
valve coil.
[S20] (white): room A
[S21] (red): room B
[S22] (blue): room C
[S23] (yellow): room D
Pull out the clamp.
The 2-room models have no
harness for [S22] and [S23].
The 3-room models have no
harness for [S23].
The 5-room models have
[S24] (green) for room E.
When reassembling, insert
each clamp into the small
hole.
6
Disconnect the
connector for the liquid
pipe thermistor [S93].
Pull out the clamp.
Step
Procedure
Points
[S80]
Clamp
(R11187)
A
B
C
D
Clamp
(R11188)
For the electronic
expansion valve coil
[S93]
(R17266)
Clamp
[S93]
(R10400)